Home » cell tower » Recent Articles:

Is Dish Networks Really Preparing to Finally Build Its Wireless Network?

Among the major wireless companies with spectrum holdings worth billions, few would suspect that the fifth largest (behind Sprint, AT&T, Verizon, and T-Mobile) is the satellite television company Dish Networks.

After spending nearly $20 billion over the last ten years acquiring nearly 95 MHz of extremely valuable low and mid-band spectrum in markets across the United States, Dish is the largest wireless company that isn’t actually providing wireless service. Critics have questioned whether Dish co-founder Charlie Ergen was ever really interested in getting into the wireless business when he could make an even bigger killing warehousing spectrum until it grows in value and can be profitably sold to someone else. One Wall Street analyst thinks there is a strong case for exactly that. Cowen and Company estimates Dish’s holdings are now worth $30.2 billion — a $10 billion profit possible from keeping spectrum off the market until a buyer is willing to make an offer Dish cannot refuse.

Unfortunately for Ergen, spectrum is public property and ultimate ownership rights can never be sold or transferred. Instead, the FCC licenses companies to use the public airwaves, and has provisions to take them back if a company does not put that spectrum to good use. For Dish Networks, the first important deadline is March 2020, by which time the FCC expects Dish to achieve at least 70% market coverage of its 700 MHz “E-Block” and 2000-2020/2180-2200 MHz AWS-4 licenses.

Dish’s “E-Block” spectrum was formerly known as UHF channel 56. Dish has already begun testing the next-generation TV standard ATSC 3.0 on its E-Block spectrum in Dallas, as part of a joint venture with TV station owners Sinclair, Nexstar, and Univision. Dish proposed to use this spectrum, which covers 95% of the United States, as a potential tool for broadcasters. Among the services Dish could offer are broadcast data applications made possible with the ATSC 3.0 standard.

Because time and money is on the line, Dish needs to either build its network quickly or sell/lease its spectrum to other companies before facing possible spectrum forfeiture in less than two years. Analysts say one of the cheapest and easiest ways of placating the FCC is to deploy a modest, narrowband wireless network designed for machine-to-machine communications. These networks rely on short bursts of data to communicate information. Possible applications include exchanging irrigation and crop data collected from wireless sensors and various remote weather and climate measurement tools.

Coincidentally, that is exactly the kind of network Ergen initially envisions, largely operating on the sparsely used AWS bands. Officially called “NB-IoT” in wireless industry parlance, the ‘narrowband Internet of Things’ network would be the first chapter of Dish’s wireless story. It’s a network done on the cheap — constructed with a relatively low investment of $500 million to $1 billion through 2020, adequate enough to keep the FCC off Dish’s back.

Ergen reports the radios have been ordered and in a sign of serious intent, Dish has now signed master lease agreements with cell tower companies that will allow Dish to place its transmission equipment on tens of thousands of cell towers around the country. The company has also hired experts in tower permitting and network design and planning. Those contracts are an important indicator for some skeptics on Wall Street who believed Ergen would not show seriousness of intent until he signed paid, binding commitments to begin network buildout.

Ergen would disagree that Dish has been foot-dragging its wireless network deployment, despite a decade of accumulating wireless spectrum that has gone unused.

“It’s all about timing; too early you are roadkill, if you get it just right you have a chance,” Ergen said. “We missed the 4G shift because of the regulatory reasons. The next big paradigm shift is 5G.”

Ergen

Unfortunately for Ergen, he will be late to that paradigm shift, admitting his dream of a national 5G network isn’t possible right now.

“We’re […] going to spend at least $10 billion or more on a 5G network,” Ergen said, while also admitting, “we don’t have that kind of capital on our balance sheet today.”

Ergen promised that sometime in the future, Dish will begin a “second phase” that will “build a complete 5G network.” But Ergen’s vision of 5G is somewhat different from Verizon and AT&T, which are focused on the consumer and business voice and data markets. Ergen envisions a robust 5G network designed to support IoT applications like smart cities, artificial intelligence, and autonomous vehicles, and does not seem interested launching a fifth national cell provider.

Ergen quit in December 2017 as CEO of Dish’s aging satellite TV business to refocus on Dish’s mobile future, and to recast the venture as a glorified startup, much like his early days in the home satellite television business where he got into the business manufacturing 10-foot C-band satellite dishes for consumers and then sold the programming to watch on those dishes. From money earned in that business, Ergen launched Dish Networks, which relies on today’s familiar small satellite dishes and competes with DirecTV.

Ergen’s satellite TV venture only had to compete with one other satellite provider. His wireless network will have to compete with at least four established national wireless companies, plus emerging competition from the cable industry and regional cellular providers. Ergen tried to turn that obvious business challenge into an opportunity:

“We have two disadvantages; We don’t [have many] customers and we are not as knowledgeable as other people in the business, but we don’t have the legacy of 2G, 3G, 4G networks,” Ergen said. “We have a clean sheet of paper with 5G. It reminds me of 1990 when we decided to reinvent ourselves from the big dish business to small dish. It took five years to design and build that system with not one penny of revenue, and we obsoleted the business we were in. When we got into satellites, we didn’t know anything about it, but neither did anyone else. It is the same with 5G/IoT. We are not the world’s experts, but neither is anyone else.”

What Ergen lacks in experience he makes up for in enthusiasm, laying out plans for Dish’s wireless future. By the time he activates 5G service, Dish expects to use its combined 95 MHz of spectrum in the 600 MHz and 2 GHz range for that network. That will take until at least July 2020, because many of the 600 MHz frequencies he needs are still occupied by UHF television stations that are in the process of migrating to a more compact UHF band.

Dish has spectrum holdings that reach almost every corner in the U.S.

Ergen may also consider acquiring additional millimeter wave spectrum if he deploys small cell technology. He has even decided to keep small cell and larger traditional “macrocells” found on traditional cell towers on different frequencies, claiming sharing the frequencies would create interference issues.

Ergen also hopes to convince the FCC to repurpose little-known Multichannel Video Distribution and Data Service (MVDDS) spectrum located between 12.2-12.7 GHz for 5G wireless applications. That solid block of 500 MHz of spectrum could be an important asset to power small cell 5G networks, because it can support faster speeds than the typical smaller blocks of frequencies most companies control. MVDDS also lacks a significant constituency to protect it, having been woefully underutilized in the United States. Only tiny Cibola Wireless, an ISP in Albuquerque, N.M., licenses MVDDS technology for its wireless internet service, selling Albuquerque residents up to 50 Mbps speed for $79.99 a month. Users claim the service does not suffer the latency problems of traditional satellite internet access, but can still slow down if too many users are online at the same time.

Back in 2010, MVDDS technology was seen as a potential competitor to companies like Dish and DirecTV, as well as satellite internet providers which share similar spectrum. Like satellite internet, MVDDS can transmit and receive data over a small dish. But instead of pointing it to a satellite 44,000 miles away, MVDDS systems target a ground-based transmission tower much closer nearby. The technology never attracted much attention, and will now likely be displaced by 5G in the United States, although it has done modestly better abroad, serving a limited customer base in the United Arab Emirates, Ireland, France, Vietnam, Greenland and Serbia.

AT&T and Crown Castle Sign New Agreement Permitting 5G Cells on Existing Infrastructure

Phillip Dampier April 11, 2018 AT&T, Consumer News, Wireless Broadband Comments Off on AT&T and Crown Castle Sign New Agreement Permitting 5G Cells on Existing Infrastructure

AT&T and Crown Castle, which owns many of the cell towers that AT&T and other wireless carriers use, have signed a new agreement allowing AT&T to lease space on existing Crown Castle towers to deploy 5G wireless infrastructure.

The key to the new agreement is streamlining the process of contracting for long-term space for small cells and other infrastructure that will be critical for 5G wireless deployments. AT&T also wants to more rapidly execute contracts to deploy wireless network upgrades to fulfill its obligations for FirstNet, the first responders emergency communications network.

“This agreement marks a significant milestone in our relationship with Crown Castle,” said Susan Johnson, executive vice president of global connections and supply chain. “It establishes a market-based framework and simplifies the lease management and administration process. This will allow us to streamline network projects to better serve our customers.”

The new agreement also covers traditional cell tower infrastructure for 4G LTE services. It will include provisions for long-term leasing, which will give AT&T additional stability in planning and service.

 

Crown Castle owns, operates and leases more than 40,000 cell towers and approximately 60,000 route miles of fiber supporting small cells and fiber solutions across every major U.S. market.

The FCC Four: The Top Special Interests Lobbying the FCC

Phillip Dampier April 9, 2018 Competition, Consumer News, Editorial & Site News, Public Policy & Gov't, Rural Broadband, Sprint, Verizon, Wireless Broadband Comments Off on The FCC Four: The Top Special Interests Lobbying the FCC

March was a big month for lobbyists visiting the Federal Communications Commission, which opened the doors to wireless special interest groups for “ex parte” meetings with agency staffers that, in turn, brief the three Republicans and two Democrats that serve as FCC commissioners.

Last month’s ex parte filings reveal strong evidence of a coordinated, well-financed campaign by America’s wireless operators and cable companies to get the FCC to ease off regulations governing forthcoming 5G networks, particularly with respect to where tens of thousands of “small cell” antennas will be installed to deliver the service.

Four industry trade groups and companies are part of the concerted campaign to scale back third party control over where 5G infrastructure will end up. Some want to strip local governments of their power to oversee where 5G infrastructure will be placed, while others seek the elimination of laws and regulations that give everyone from historical societies to Native American tribes a say where next generation wireless infrastructure will go. The one point all four interests agree on — favoring pro-industry policies that give wireless companies the power to flood local communities with wireless infrastructure applications that come with automatic approval unless denied for “good cause” within a short window of time, regardless of how overwhelmed local governments are by the blizzard of paperwork.

Here are the big players:

The Competitive Carriers Association (CCA)

The CCA is primarily comprised of rural, independent, and smaller wireless companies. In short, a large percentage of wireless companies not named AT&T or Verizon Wireless are members of CCA. The CCA’s chief goal is to protect the interests of their members, who lack the finances and political pull of the top two wireless companies in the U.S. CCA lobbyists met ex parte with the FCC multiple times, submitting seven filings about their March meetings.

CCA’s top priority is to get rid of what they consider burdensome regulations about where members can place cell towers and antennas. They also want a big reduction in costly environmental, tribal, and historic reviews that are often required as part of a wireless buildout application. CCA lobbyists argue that multiple interests have their hands on CCA member applications, and fees can become “exorbitant” even before some basic reviews are completed. The CCA claims there have been standoffs between competing interests creating delays and confusion.

Costs are a relevant factor for most CCA members, which operate regional or local wireless networks often in rural areas. Getting a return on capital investment in rural wireless infrastructure can be challenging, and CCA claims unnecessary costs are curtailing additional rural expansion.

NCTA – The Internet & Television Association

The large cable industry lobbyist managed to submit eight ex parte filings with the FCC in March alone, making the NCTA one of the most prolific frequent visitors to the FCC’s headquarters in Washington.

The NCTA was there to discuss the Citizens Broadband Radio Service (CBRS) band, which is of particular interest to cable companies like Charter Communications, which wants to get into the wireless business on its own terms. Cable lobbyists, under the pretext of trying to avoid harmful interference, want to secure a large percentage of the CBRS band for their licensed use, at the expense of unlicensed consumers and their wireless industry competitors.

The cable industry wants CBRS spectrum to be wide, spacious, and contiguous for its cable industry members, which should open the door to faster speeds. The lobbyists want to make life difficult for unlicensed use of the band, potentially requiring cumbersome use regulations or costly equipment to verify a lack of interference to licensed users. They also want their traffic protected from other licensed users’ interference.

CTIA – The Wireless Association

The wireless industry’s largest lobbying group made multiple visits to the FCC in March and filed 10 ex parte communications looking for a dramatic reduction in local zoning and placement laws for the next generation of small cells and 5G networks.

The CTIA has been arguing with tribal interests recently. Tribes want the right to review cell tower placement and the environmental impacts of new equipment and construction. The CTIA wants a sped-up process for reviewing cell tower and site applications with a strict 30-day time limit, preferably with automatic approval for any unconsidered applications after the clock runs out. Although not explicitly stated, there have been grumblings in the past that tribal interests are inserting themselves into the review process in hopes of collecting application and review fees as a new revenue source. Wireless companies frequently question whether tribal review is even appropriate for some applications.

Sprint has had frequent run-ins with tribal interests demanding several thousand dollars for each application’s review under the National Historic Preservation Act (NHPA), which is supposed to protect heritage and historical sites.

In Houston, Sprint deployed small cells around the NRG Stadium, but found itself paying fees to at least a dozen Indian Tribal Nations as part of the NHPA. The NHPA opens the door to a lot of Native Americans interests because of how the law is written. Any Tribal Nation can express an interest in a project, even when it is to be placed on public or private property that is not considered to be tribal land. In Houston, Sprint found itself paying $6,850 per small cell site, not including processing fees, which raised the cost to $7,535 per antenna location. Those fees only covered tribal reviews, not the cost of installation or equipment. Some tribes offered better deals than others. The Tonkawa Tribe has 611 remaining members, mostly in Oklahoma. But they sought and got $200 in review fees for the 23 small cell sites deployed around the stadium. The Kiowa Indian Tribe of Oklahoma, not Texas, charged $1,500 for the 23 applications it reviewed.

Sprint complains it has paid millions in such fees over the last 13 years and no tribe to date has ever asked to meet with Sprint or suggest one of its towers or cell sites would intrude on historic or tribal property.

“Tribal Nations are continuing to demand higher fees and designate larger and larger areas of interest,” says Sprint. “At present, there are no constraints on the amount of fees a Tribal Nation may require or the geographic areas for which it can require payment for review. The tribal historic review process remains in place even in situations—such as utility rights-of-way—where the Commission has exempted state historic review.”

The CTIA wants major changes to the NHPA and other regulations regarding cell tower and antenna placement before the stampede of 5G construction begins.

Verizon

Verizon has been extremely busy visiting with the FCC during the month of March, filing 10 ex parte communications, also complaining about the tribal reviews of wireless infrastructure.

Verizon argues it wants to expand wireless service, not effectively subsidize Native American tribes.

“The draft order’s provisions to streamline tribal reviews for larger wireless broadband facilities will likewise speed broadband deployment and eliminate costs, thus freeing up resources that can, in turn, be used to deploy more facilities,” Verizon argued in one filing.

Verizon has also been carefully protecting its most recent very high frequency spectrum buyouts. It wants the FCC to force existing satellite services to share the 29.1-29.25 GHz band for 5G wireless internet. Verizon has a huge 150 MHz swath of spectrum in this band, allowing for potentially extremely high-speed wireless service, even in somewhat marginal reception areas.

“Verizon assured the commission that even when sharing with other services, we would be able to make use of the 150 MHz of spectrum in this block to provide high-speed broadband service to American consumers,” said one filing.

Residents Rebel Against Verizon’s “Godzilla” Small Cell Poles, Previewing 5G Battles to Come

Judith Monroy looks up at a recently installed Verizon small cell signal booster (upper right) placed a few dozen feet from her front door. It was accompanied by a 5-foot high utility cabinet (lower left) containing backup batteries to power Verizon’s equipment for up to four hours in the event of a blackout. (Image courtesy: The Press Democrat)

A preview of the possible aesthetics battle of future 5G small cells that are expected to proliferate across America’s cities and towns in the coming years is taking place in Santa Rosa, Calif., where residents and some city officials reacted with surprise when Verizon began attaching “small cell” wireless repeater equipment on 72 city-owned light and utility-owned poles around the city. While not exactly the same at the 5G equipment Verizon is preparing to install in Sacramento to launch its forthcoming fixed wireless service, the similar-sized equipment turned out to look nothing like what was promised by Verizon officials. But city officials learned this only after the project was approved by a 7-0 City Council vote in 2017.

In January, one resident learned about the sudden arrival of Verizon Wireless’ equipment when she opened her front door one morning to confront a utility pole decorated with antenna equipment and a 5-foot high utility box about 30 feet away from her home.

“I’m planning to put this house on the market and the mechanisms on the telephone pole and in the ground are very aggressive and ominous-looking,” said Judith Monroy, 75. “You can’t miss them.”

Within days, someone vandalized the utility box, spray painting the word “no” and “stop this” for all to see.

In many areas, 5G small cells will be installed on utility or light poles in the front yards of residential homes. Wireless companies will want to place equipment on poles that are not obstructed by foliage or tall, nearby infrastructure, which can block signals. Requests for aggressive tree trimming to remove obstacles, within the limits permitted by local ordinances and the policies of the pole owner, are also likely. This is certain to create controversy if property owners find their trees or shrubbery removed or aggressively pruned. But for many others, the appearance of the new equipment is enough to provoke protests.

When some property owners discovered Verizon was also adorning electric utility poles with its cellular equipment, some started referring to them as “PG&E’s Godzilla Poles.”

‘PG&E Pole Godzilla’ (Image courtesy: The Press Democrat)

The utility poles hosting Verizon’s equipment have new “branches” attached several feet below pre-existing utility wiring, onto which small cell antennas are attached.

As more equipment gets installed, the more concerned citizens are phoning up city hall to complain.

Last week, city officials bowed to citizen pressure and temporarily suspended Verizon Wireless’ antenna upgrade program. While some residents cited health and safety fears from electromagnetic radiation — a fear repeatedly debunked — many more were upset by the aesthetics of the equipment and wondered if the city got a raw deal.

“I think it is time to push the pause button on this installation in our neighborhoods,” said John Cushman, a resident of Hidden Valley. “This project has been rushed and the only urgency I can see is financial.”

Verizon is paying the city $350 per pole, an amount some local residents consider absurdly low. As opposition mounted, some uncomfortable members of City Council that originally voted in favor of Verizon’s plan changed their minds, according to The Press Democrat:

Neighbors are not happy about Verizon’s new equipment. (Image courtesy: The Press Democrat)

“I am supportive of putting the brakes on this,” Councilman Tom Schwedhelm said. “I’m not convinced that we’ve done everything that we can so we can look anyone in the face and say ‘Yes it’s safe there. It’s safe to be in front of my house.’ ”

Councilman Jack Tibbetts said he viewed the rollout as a “commercial enterprise” that perhaps was better suited to commercial areas given the city’s stated goal of helping strengthen the city’s wireless infrastructure to foster entrepreneurialism.

“I’d like to see residential zones be carved out in our ordinance,” Tibbetts said to loud applause in a chamber full of people wearing bright yellow stickers reading “Caution: Cell tower microwave frequency hazard.”

But Verizon may have positioned itself to move forward regardless of what the city has in mind.

The company announced it would continue installation at 25 previously approved sites where it already has permits in-hand. Verizon has yet to obtain permits to place equipment at two other PG&E sites and 31 city light poles.

The city will not have much say over pole attachments on PG&E’s infrastructure, which is governed on the state level by the California Public Utilities Commission.

If the city denies Verizon’s request to install its equipment on city-owned light poles, the company could just move those antennas to other PG&E poles nearby instead.

Wireless Industry Claims Removing Regulatory Hurdles Will Save $1.6 Billion on 5G Deployment

Phillip Dampier March 14, 2018 Astroturf, Consumer News, Public Policy & Gov't, Video, Wireless Broadband Comments Off on Wireless Industry Claims Removing Regulatory Hurdles Will Save $1.6 Billion on 5G Deployment

Accenture’s six-page analysis.

CTIA, America’s largest wireless industry trade group and lobbyist, commissioned a research consultant to produce a six-page analysis that unsurprisingly concludes stripping some oversight responsibilities regarding cell tower placement would reduce the cost to deploy 5G wireless small cells by as much as $1.6 billion over the next nine years.

The Federal Communications Commission is currently considering industry-friendly proposals that would “streamline” and “modernize” the historic and environmental regulatory requirements for wireless deployments, exclude small cells from certain federal regulatory reviews, and put a strict limit on completing environmental impact reviews on new tower and antenna installations or else they will be automatically approved.

The Accenture analysis, produced at the request of CTIA, claims that it will cost an average of $9,730 for each 5G small cell regulatory review. But the report also states only 28-29% of installations will face this type of review. The CTIA implies it is much worse than that in its new 30-second ad complaining about regulatory burdens. That ad suggests 5G small cell “approval can take a couple of years.”

As the FCC ponders further deregulation of cell tower and antenna placement, wireless industry players are sharing their horror stories with the FCC to strengthen the agency’s likely  view that installation rules and oversight should be relaxed.

In January, Sprint complained it faced a demand to pay a $90,000 “tribal review fee” for six tower upgrades in the Chicago area. The company claims the towers were located in historic preservation areas, but not in areas of tribal significance. Sprint added in its letter to the FCC it only planned to install additional antenna equipment at those tower sites to increase capacity, not erect new towers.

The wireless industry is also lobbying to get cut-rate access to public infrastructure like street lights, on which it eventually plans to place 5G network equipment.

In states like California, AT&T has pushed hard for new legislation that would mandate cities and counties to give the company open access to public infrastructure in public rights-of-way or utility easements. In a 2017 bill before the California Senate, companies like AT&T would face a fee limit of $100-850 per small cell per year, indexed for inflation,

With multiple wireless companies prepared to enter the 5G marketplace, utility poles could get crowded.

Cities and counties may also find their right to object to what eventually ends up on their poles curtailed as a result of the deregulation effort.

CTIA’s new 30-second advertisement claims 5G small cells can be installed in about 90 minutes, but only after waiting years for a sluggish review process. (30 seconds)

Search This Site:

Contributions:

Recent Comments:

Your Account:

Stop the Cap!