Home » broadband service » Recent Articles:

Multiple Sources Confirm Austin As Next Google Fiber City; Here Are Some Clues Why

austin

Austin, Texas is likely the next Google Fiber city.

Austin, Texas will be the second major U.S. city to receive Google Fiber’s 1,000/1,000Mbps service, perhaps as early as 2014.

A “major announcement” at a news conference scheduled for Tuesday morning is expected to bring more than 100 community leaders together to hear Google’s plans for the city.

Local media reports, an accidental mention of Austin as the next Google Fiber city on Google’s Fiber Blog, and at least one confidential source at Austin’s public utility company (that owns the poles Google Fiber will be strung across) makes it all-but-certain Austin and its nearby suburbs will get the service.

Austin would seem a natural target for Google as home to the high-tech South by Southwest. Austin also hosts Dell, Texas Instruments, AMD, Samsung, IBM, Intel, and a myriad of Internet start-ups. But a key factor for Google also seems to be the presence of Austin Energy, the nation’s 8th largest community-owned electric utility, serving more than 420,000 customers and a population of almost one million. Kansas City, the first choice for Google Fiber, also has a municipal utility company.

Milo Medin, Google’s vice president of access services, made it clear that Google is targeting cities where it does not have to deal with intransigent privately owned utility companies that make life difficult (or expensive) to attach Google Fiber to utility poles. Municipally owned providers have proved easier to work with, and in Kansas City elected officials also helped cut through administrative red tape and facilitated a working relationship between Google and government officials responsible for issuing work permits and clearing up zoning headaches.

Areas served by investor owned electric giants like Southern California Edison, Florida Power & Light, Commonwealth Edison, Consolidated Edison, Georgia Power, Dominion Resources, Detroit Edison, Public Service Enterprise Group, and others may be at an immediate disadvantage in the race to become the next Google Fiber city if those companies attempt to throw expensive roadblocks or disadvantageous bureaucracy in front of Google.

google fiberAnother factor in Kansas City’s favor was the large amount of pre-existing conduit available to pull fiber infrastructure through without tearing up streets. Cities with this type of infrastructure already in place dramatically reduces construction costs and permit delays.

Google Fiber’s project in Austin will compete directly with Time Warner Cable and AT&T U-verse. Time Warner Cable customers antagonized Austin residents in the spring of 2009 with a planned market test of consumption billing and usage caps for its Internet service. Google Fiber makes a point to say its broadband service is never usage-limited. AT&T U-verse customers in Austin have so far  not faced punitive measures from the phone company when exceeding its 250GB U-verse usage cap.

Many cable industry analysts predicted Google Fiber was simply a show project in Kansas City, designed to embarrass the telecommunications industry’s mediocre and expensive broadband service offerings. But a move into Austin signals Google more likely sees its fiber network as a lucrative business opportunity — one that could gradually be expanded to other cities.

What communities could get the service next? Google seems likely to avoid serving areas covered by Verizon FiOS, because competing fiber networks would likely not produce the bang for the buck Google needs to draw subscribers, and Medin makes it clear the company has found working with publicly owned utility companies easier than privately owned ones, so future Google Fiber cities will likely have these factors in common:

Having a publicly-owned utility helps.

Having a publicly owned utility helps.

  • A high-tech business community and well-educated workforce in a medium to large city;
  • A publicly owned municipal utility willing to work with Google;
  • Pre-existing infrastructure to support fiber service without tearing up streets and neighborhoods;
  • A local government willing to cut red tape and ease Google’s expansion;
  • No Verizon FiOS fiber service in the immediate metropolitan area;
  • A reasonable level of regulations covering environmental impacts of utility infrastructure work, permits, and licensing.

Such requirements would wipe out almost all New York (except Rochester, Binghamton and the Southern Tier around Ithaca — all completely bypassed by Verizon FiOS) and New Jersey as possible candidates. California outside of Mountain View would also seem untenable because of government regulations, sprawling cities, and private utilities. Florida and Georgia have two major private power companies to contend with as well. But there are opportunities in Texas, the Carolinas, Minnesota, Washington, Arizona, Colorado, Tennessee, Massachusetts, and across several midwestern states, especially those served by AT&T’s inferior U-verse system.

[flv width=”640″ height=”380″]http://www.phillipdampier.com/video/KXAN Austin Google Fiber Expected in Austin 4-5-13.mp4[/flv]

KXAN in Austin spent almost seven minutes of its weekend evening newscast talking about forthcoming Google Fiber in Austin.  (7 minutes)

AT&T U-verse, Verizon FiOS Competing Head to Head in Dallas Suburbs

Phillip Dampier April 2, 2013 AT&T, Competition, Verizon Comments Off on AT&T U-verse, Verizon FiOS Competing Head to Head in Dallas Suburbs

Verizon-logoResidents of some cities north of Dallas are in the unique position of being able to choose between two phone companies and at least one cable operator for television, phone, and broadband service.

AT&T U-verse competes head to head with Verizon’s advanced FiOS fiber to the home service in communities like Allen, Plano, and Frisco, Tex.,  because of franchising agreements that opened to door for both companies to compete in overlapping territories.

Top secret.

The aggressor was Verizon, which took advantage of Texas’ statewide video franchise law to “overbuild” its FiOS fiber operation into AT&T’s landline territory, particularly in affluent Frisco and Allen.

Verizon got interested in the area in 2008 because of the population boom and housing growth in North Texas. It was easy to lay fiber in the large housing developments under construction. When the economy crashed along with the housing market during the Great Recession, Verizon’s investment and interest in expanding FiOS declined. Today, some areas have access to both Verizon FiOS and U-verse from AT&T, as well as at least one cable operator. Other areas, especially in unfinished planned neighborhoods, only have access to only one provider, AT&T.

Verizon’s decision to overbuild and face AT&T was a decision to target investment into some of the richest areas in the Dallas-Ft. Worth Metroplex. Lower income areas often have neither service, as Verizon has focused efforts north of the city and AT&T U-verse is still not available in certain areas of downtown Dallas.

Consumer Reports Rates Your Broadband Provider: Fiber Great, Cable/DSL Meh, Satellite Sucks

Scored first place again this year.

Scored first place again this year.

Consumer Reports has released its 2013 ratings for broadband service providers, showing independently owned cable companies and fiber optic broadband services from companies large and small deliver the best bang for the buck.

WOW, a small cable operator serving limited areas of the country yet again achieved first place in the ratings, appearing in the May issue. Verizon and Frontier’s FiOS fiber networks rated #2 and #5 respectively. (Frontier acquired its fiber to the home network from Verizon in 2009.)

In general, cable broadband service scored considerably better than telephone company DSL. Wireless broadband did more poorly, with Verizon’s 4G LTE network in 23rd place. Satellite scored worst, with both ViaSat and Hughes among the bottom three.

Verizon's ongoing speed boosts assure the company of high ratings for its FiOS fiber network.

Verizon’s ongoing speed boosts assure the company of high ratings for its FiOS fiber network.

Mediacom once again took honors as America’s worst cable company. This year, it managed to score even worse than ViaSat, formerly WildBlue. Other bottom dwellers: FairPoint DSL, AT&T DSL, Frontier DSL, Charter Cable and Comcast Cable.

Compared with last year, few companies saw dramatic improvements or declines, despite glowing press releases touting improvements and investment.

Time Warner Cable, which scored 19th last year dropped to 20th place this year.

TDS, an independent phone company, managed a surprising 5th place score last year, despite only giving most of its customers DSL service. This year it is in eighth place.

Cablevision, which faced criticism for an overburdened broadband network last year managed almost no change in ratings this year, despite a measurable improvement in service.

Consumer Reports’ ratings are largely based on customer perceptions shared with the magazine in its annual questionnaire. CenturyLink may have delivered an improved experience for its customers between 2012 and 2013. Last year the phone company was in 18th place. This year it improved to 11th place.

isp ratings 2013

Verizon’s Long Term Plan to Abandon Wired Landlines/Broadband in Non-FiOS Areas Begins

Verizon CEO telegraphed his plans to dump rural landline service last summer.

Verizon CEO Lowell McAdam telegraphed his plans to dump rural landline service last summer.

You should believe Verizon Communications CEO Lowell McAdam when he says he intends to end wired telephone and broadband service for areas that are simply not economically feasible for fiber upgrades. McAdam’s grand plan is now coming true for customers in parts of Florida and on Fire Island, N.Y.

Last summer, Stop the Cap! covered McAdam’s comments to Wall Street investors (that are always the first to know) at the Guggenheim Securities Symposium:

“In […] areas that are more rural and more sparsely populated, we have got [a wireless 4G] LTE build that will handle all of those services and so we are going to cut the copper off there,” McAdam said. “We are going to do it over wireless. So I am going to be really shrinking the amount of copper we have out there and then I can focus the investment on that to improve the performance of it.”

The writing is already on the wall:

  1. Verizon has been penalized and criticized in several states by public utility commissions for the ongoing degradation of its copper network. Verizon sees further investment in copper technology as throwing good money after bad, but spending millions on additional fiber upgrades isn’t appealing either. The result is deteriorating service. From downtown Manhattan to New Jersey to Maryland, D.C. and Virginia, Verizon’s service failures have left customers frustrated and sometimes waiting weeks or months for repair crews to turn up to restore basic phone service. Even more dangerous, Verizon was to blame for significant 911 network failures near the nation’s capital. Post Sandy, there are still sections of lower Manhattan without phone service nearly five months after the storm struck. Five months.
  2. Verizon sold off telephone service in northern New England several years ago to FairPoint Communications, knowing full well Verizon never had an interest in upgrading any part of Vermont, New Hampshire or Maine to fiber service. In many smaller former GTE telephone areas too small to successfully argue a case for return on investment, Verizon decided selling those territories off was the best option. Hawaiian Telcom and Frontier Communications now own many of those former-Verizon territories.
  3. Verizon has decreased marketing its wired DSL service and stopped selling it altogether to customers who want broadband-only service. That seems counter-intuitive for a company that recognizes future revenue possibilities come primarily from broadband and data services.

Traditionally, customers reporting trouble on a phone line get a visit from Verizon technicians who track the problem down and repair it. But Verizon no longer wants to spend money fixing copper wire-related problems. Customers reporting chronic phone static or outages are now being asked to abandon their traditional landline service instead:

The end of an era.

The end of an era.

Customers who live in Florida currently have a choice. During the trial, they can switch to Voice Link or keep their current landline service. On Fire Island, just south of Long Island, customers will not have that choice. Verizon is testing the will of New York regulators asked to allow the company to gradually abandon landline and wired Internet facilities on the island. Customers previously knocked out by Hurricane Sandy have no alternative — switch to a wireless option like Voice Link or lose  telephone service. As the network degrades further on the island, it is a safe bet more Fire Island residents will find themselves confronted with a wireless future courtesy of Voice Link.

Verizon is careful to note its Voice Link service comes at no additional cost to customers — their phone bills will remain the same, at least for now. But the transition includes several important caveats:

  1. Voice Link is not subject to state or federal oversight or quality of service consumer protection laws that apply to traditional landline service;
  2. The customer is responsible for providing an indoor space to mount the equipment (hardly unobtrusive, the receiver is eight inches tall) and provide electric power and AA batteries for battery backup;
  3. Voice Link does not work with any data services including broadband or dial-up Internet, faxing, medical monitoring, alarm systems, etc. You will be pitched an expensive Verizon Wireless data plan if you want Internet access;
  4. During recent severe storms, copper landline networks often continued to work but cell phone service failed over wide areas because of call congestion and  long-term power outages. Similar failures will leave Voice Link non-operational;
  5. Voice Link customers lose DSL service and may have little chance of getting it back once they switch.

Verizon’s solution for Fire Island represents the long-term vision of McAdam coming to fruition. Complaining customers have not been able to persuade the company to abandon its plan, but New York State regulators might, if the issue gets enough attention.

In states with less aggressive regulators, Verizon could implement its Fire Island strategy nearly at-will, especially in rural service areas. Verizon’s plan differs little from that of AT&T, another major service provider seeking permission from regulators to abandon rural landline networks. AT&T is betting the Federal Communications Commission will approve AT&T’s “network transition plan” for all of its rural customers. Verizon is starting smaller, gradually implementing its transition under the radar of many state and federal officials.

AT&T wants to wind down its own rural landline network.

AT&T wants to wind down its own rural landline network.

So why adopt Voice Link — a wireless solution, when copper wire network repairs remain a viable option?

The reasons are simple:

  1. Voice Link is cheaper to run and maintain as a wireless service and uses existing Verizon Wireless cell towers;
  2. Verizon can further cut their unionized workforce that maintains the company’s landline network;
  3. Wireless products escape regulatory oversight;
  4. The company can push customers to wireless data products that cost far more than wired DSL broadband service;
  5. Verizon doesn’t have to upgrade the rest of their network to fiber.

Customers in Verizon service areas should appeal to regulators and their elected officials to stop the abandonment of wired infrastructure. Verizon argues maintaining its network doesn’t make sense when customers are fleeing their landlines. But rural customers are not disconnecting broadband service that travels across the same network. Even basic DSL is coveted in rural Verizon territories where Internet access remains unavailable. Just about everyone wants the option of FiOS fiber, perhaps the most coveted network upgrade around until Google announced its gigabit fiber project in Kansas City.

Nobody wants Verizon or AT&T to keep up its copper wire facilities indefinitely. But a better solution would be a regulatory mandate that requires Verizon and AT&T to gradually replace antiquated and failing copper infrastructure with fiber wherever possible. It is more than possible to do this on Fire Island. Verizon’s service area in Florida is hardly rural either. Verizon Florida (formerly GTE Telephone) serves Tampa-St. Petersburg east to Lake Wales, a major metropolitan region in central Florida.

What is best for shareholders should not be the final determining factor for an important utility service. If customers prefer the option of Voice Link for home phone service, there is nothing wrong with that. But wireless service as the only option customers have for broadband service? Not at Verizon Wireless’ prices.

Verizon Seeks to Abandon Landlines on Fire Island; Wireless or You Are On Your Own

Verizon-logoVerizon officials have announced they will abandon their damaged wireline network serving several hundred permanent residents and businesses on Fire Island, replacing voice telephone service with a wireless system called Voice Link critics say will end high-speed Internet service and hurt business.

Fire Island’s landline network has been barely functional since Hurricane Sandy struck last October. Verizon has yet to make significant repairs, leading to ongoing complaints from residents who live on the island year-round. Verizon’s wish to eventually abandon its wired network facilities entirely has created concern among island officials and public safety agencies, noting the summer population on the island swells well into the thousands.

Verizon’s plan may leave businesses unable to process credit card transactions and prevent residents from getting back DSL broadband service they lost during the storm, much less get it in the future. For some, it represents turning the clock back to the days before Internet access.

“Verizon has given us a dial tone basically,” Ocean Beach Mayor James Mallott told Newsday. “But as far as DSL, ATMs, point-of-sale systems, all the rest of that stuff, we’re pretty much on our own.”

Fire Island resident Meg Wallace notes Verizon’s plan has not gone unnoticed by the New York State Public Service Commission. The PSC is currently monitoring the situation and invites comments from interested parties.

“Right now, only Saltaire has filed a formal complaint with them, along with one village’s fire official,” Wallace reports. “It is easy to register a complaint either by filling out a complaint form on their website or calling the NYSPSC directly at (800) 342-3377. They are concerned about public opinion, so the more calls and formal complaints filed by both home and business owners the better.”

Verizon officials have defended their decision, claiming a wireless system is more robust and can withstand severe weather better than a wired network. Another reality impacting the decision is the ongoing loss of landline customers. Verizon, the sole provider on the island, has lost 25 percent of its landline business in the last two years. The company claims 80 percent of Verizon-handled calls to and from the island are through Verizon Wireless.

Fire Island

Fire Island

Verizon told local officials that Cherry Grove and points east still have undamaged fiber optic and copper lines that should be able to work as usual this summer and will be left in place for now. On the west end of the island  from Kismet to Sailor’s Haven, the damage was more significant and Verizon has announced its intention to abandon wired service.

Although west end customers will be scheduled for Voice Link installations starting in April, those on the east side should not get too comfortable with their wired service because Verizon has announced it will not upgrade or make future significant repairs to its wired infrastructure going forward. When the remaining landline facilities eventually fail, affected customers will also be moved to Voice Link.

How It Works

out-of-serviceStarting April 1st, customers calling with service problems on Fire Island will be redirected to special operators trained to pitch customers the Voice Link service as a replacement. These agents will also handle billing adjustments and drop phone package features Voice Link does not support. If the customer only wants phone service, Verizon will schedule an installation date for Voice Link. A technician will arrive with a wall-mounted box about 8″ high that will be installed in the room that provides the best reception from a nearby Verizon Wireless tower. The box will then be connected to your home telephone wiring and a nearby power outlet so existing telephones will work once again. The box has battery backup powered by customer-installed and maintained AA batteries.

If a customer also had broadband service with Verizon, they will not be getting it back. Instead, an agent will attempt to sell the customer a Verizon Wireless mobile broadband package at a significantly higher cost. For example, a 10GB monthly usage plan added to an existing Verizon Wireless account will cost an extra $20 a month for the “Mi-Fi” mobile hotspot device fee and $100 a month for the data package. Verizon DSL in comparison offered unlimited access for $30-50 a month, depending on the plan selected and any promotional discounts.

Verizon said it is currently improving reception of its 4G LTE network in areas worst-affected by storm damage.

Voice Link is a voice-only product. It does not support broadband, telephone modem connections, faxing, alarm monitoring, home medical monitoring, certain communications equipment for the impaired, or other data services including credit card processing. It does support E911, which gives detailed address information to a 911 operator.

Verizon’s Voice Link also creates a problem for some satellite dish customers. Some satellite companies need a landline connection for handling pay-per-view orders. That data connection does not work with Voice Link either.

Your voice line bill will remain the same if you switch to Voice Link. But customers will lose the benefit of oversight from the Public Service Commission if things go wrong. Voice Link, unlike traditional landline service, is an unregulated service not subject to government oversight.

Voice Link: Coming Soon to Your Area?

copper messVerizon’s Voice Link service is by no means intended to be used only on Fire Island.

Voice Link is being trialed in Florida (Project Thunder) as a landline replacement option for use in areas where Verizon’s copper network has deteriorated and the company is unwilling to spend money on fiber upgrades. If successful, Verizon intends to switch a growing number of Verizon customers nationwide outside of FiOS fiber areas to the wireless service when they report trouble with their phone lines.

Local 824 of the International Brotherhood of Electrical Workers provided insight when one of their workers attended a training class and participated in a ride-along with Verizon technicians installing the service in Florida.

John Glye reports that Verizon considers a customer a candidate for Voice Link if they have chronic phone line problems and only want traditional voice telephone service.

Currently, if customers in Florida are persuaded to switch, a migration order is created. If they want to keep the service they have, a traditional copper trouble ticket will be created and repair crews will be dispatched.

The unit is about eight inches tall and has the following connections:

  • 2 RJ 11 ports
  • Antenna
  • Voice Message indicator
  • Signal strength indicator
  • Power Button
  • Power Port

Installation time is about 45 minutes. The unit must be mounted inside and the customer must supply power and a safe place for the unit. The customer’s existing copper line connection from the home to the pole is disconnected/removed. In the ride-along Glye participated in, he reports the customer was pleased with the outcome, having reported constant static aggravated by rain on her copper landline. After the wireless service was installed, the static was gone and the call quality was good.

Search This Site:

Contributions:

Recent Comments:

Your Account:

Stop the Cap!