Home » cell tower » Recent Articles:

Communities and States Tell FCC to Back Off Proposed Wireless Infrastructure Reform

States and communities across the country are warning the Federal Communications Commission its proposal to limit local authority over wireless infrastructure siting will create chaos and open the door to public safety and aesthetics nightmares.

The FCC’s proposal would allegedly accelerate wireless infrastructure deployment by removing or pre-empting what some on the Commission feel are improper zoning barriers, unjustified fees meant to deter providers from adding new towers, and various other bureaucratic impediments. It would modify current “shot clock” rules that set time limits on applications and deem them automatically granted if a local or state authority failed to reach a decision in as little as 60 days.

Pai

While the wireless industry has expressed strong support for the proposed changes introduced by FCC Chairman Ajit Pai in March during the FCC’s “Infrastructure Month,” many states and localities are fiercely opposed to what some are calling a federal government takeover of local zoning and permitting. States as diverse as Illinois, Utah, and Maine have submitted comments objecting to the proposal, noting it will turn the FCC into a national zoning agency that could allow the installation of new cell towers and monopole antennas just about anywhere if the clock for consideration has run out.

Several communities have also submitted comments to the FCC reminding the agency its existing rules have allowed some providers to abuse the system, with further easing of regulatory oversight on the local level only increasing the potential for more abuse.

Communities have complained some providers have intentionally overwhelmed local authorities by submitting “bulk applications” that attempt to win approval for dozens of new sites with incomplete or missing paperwork. Others report providers using the public rights-of-way have placed large pieces of infrastructure in direct line with residents’ front doors, have created public safety problems with equipment that blocks drivers’ views at intersections, and had to contend with requests to place 120-200 foot monopole antennas on the edge of public highways and abandoned retired infrastructure providers fail to maintain or remove.

Can you find the hidden monopole tower?

The Utah Department of Transportation, among others, calls the FCC’s proposal “detrimental to public safety” and warns the FCC could end up creating a new loophole allowing providers to submit defective applications and then stalling required corrections until the shot clock runs out.

“No decisions are made on incomplete applications because the requested information is necessary for a decision to be issued,” Utah’s DOT writes. “This information may include, but is not limited to, when and where the work will be performed, type of installation, impacts to the traffic of the state highway. All safety issues must be addressed. Any shot clock start considerations by the Federal Communications Commission must be based upon completed applications. Otherwise the telecommunications company may fail to submit a completed application and continue to not submit all the requested information until the shot clock time period has run out. Such an approach would have detrimental impacts to safety of the traveling public on state highways because the Federal Communications Commission seeks to remove any authority from the states and local governments to address safety and placement after the shot clock has run out.”

Utah also fears the FCC’s decision to set uniform fees for applications could end up subsidizing large telecom companies with taxpayer dollars.

“Any requirement mandating lower fees than the actual costs will require the states to subsidize the telecommunications industry,” Utah’s DOT warned.

Maine’s Department of Transportation worries the FCC is putting the interests of multi-billion dollar telecom corporations ahead of the citizens of the state and their own needs. By allowing telecommunications companies to win irrevocable rights to place wireless towers where they want by running out the clock, the interests of those companies overshadow the public interest.

“The only ‘right’ that any entity receives to locate within Maine’s highway corridors is a revocable permit,” the DOT wrote. “To minimize overall expense and downtime, it is essential that facilities are appropriately located the first time around and there should not be any rules stating that it is in any way appropriate for an entity to construct facilities in a location that has not been explicitly approved by the applicable licensing authority, property owner or facility owner.”

Because the FCC’s proposal is so wide-ranging and skewed in favor of telecom companies, several state and local agencies are asking the FCC to clearly affirm that a company’s business interests should never come before public safety, future transportation needs, or at the public’s expense.

“Any new or revised rules should clearly affirm a state or local highway agencies’ authority to properly manage the highway corridor in the interest of highway safety, operations, and right of way preservation for future highway purposes,” offers Maine’s DOT, adding that after the state’s experience with financially troubled telecom companies abandoning outdated or damaged infrastructure, the public should not have to pay to clean it up.

“Accommodation of wireless towers or other monopole structures within the highway corridor also present hidden public expense when relocation of those facilities cause construction delays or when such facilities are abandoned by a [company] that declares bankruptcy,” the agency noted.

The Illinois Department of Transportation echoed Utah and Maine, noting the telecom industry needed to work with local and state officials to ensure timely permitting.

Instead, the telecom industry has spent millions lobbying state and federal legislators to curtail or eliminate local oversight and control. While many telecom companies are honest and accommodating, especially when they are considering major infrastructure expansion, some are not and work to game the system.

IDOT notes it is willing to manage the burden of processing applications on a timely basis, but utilities should not be rewarded with a right to run out the clock with an incomplete application.

“The burden of timely issuance of permits is shared by both the state and the industry,” IDOT wrote. “It is important that the utility fulfill its duties and meet their obligations.”

Benjamin

In one instance, a large telecom company submitted a very large number of permit applications across Illinois for a network upgrade it had no plans to commence in the near future, overwhelming permit offices. If the FCC’s reforms were in place, many of those applications would have been automatically approved after the deadline for consideration ran out, even though the provider was in no hurry to start work.

“The concept behind this is […] if a government authority doesn’t respond in a timely manner, the permit is automatically granted,” the filing said. “The [proposal] is attempting to shift the burden of court appeal to the [local permitting authority] as opposed to the permit applicant.”

Columbia, S.C. mayor Steve Benjamin believes the FCC is trying to solve a non-existent problem.

“Simply put, local rights-of-way management does not discourage wireless deployment,” Mayor Benjamin said in March. “Instead, it serves numerous public policy goals and ensures that rights-of-ways are managed in a manner that allows for all users to safely and efficiently use public rights-of-way. The city is deeply concerned […] the Commission is simply seeking to preempt local authority and to dictate how local governments should manage public property, all in an effort to marginally increase the profits of an already profitable industry at the expense of important and legitimate public interest goals.”

Communities Prepare for Onslaught of New Wireless Networks in Public Rights-of-Way

Phillip Dampier June 12, 2017 Public Policy & Gov't, Wireless Broadband 1 Comment

AT&T’s idea of a small cell deployment on an existing utility pole in Oakland, Calif. (Image courtesy: Omar Masry, a city planner living in the area, who warns other city planners: “Don’t let this happen to you.”)

Some of America’s biggest wireless telecom companies are spending millions lobbying Washington and state legislatures for the right to place a myriad of new wireless transmitters and small cells in the public rights-of-way without local communities having much say about where they go and what they look like.

Utility Traffic Jam

Over the next five years, tens of thousands of new “small cell” devices are expected to be placed on utility poles to manage forthcoming wireless services, and that represents a conservative estimate. Every major wireless carrier is contemplating new line-of-sight 5G communications networks that will require a massive deployment of new wireless antennas that will serve a smaller audience of devices than traditional cell towers have. But wireless companies will not be alone. Cable operators are also expected to enter the wireless business, not only to resell other providers’ cellular services but also to deploy new low power, line of sight networks to manage the Internet of Things (IoT), which will wirelessly connect devices ranging from home appliances and heating/cooling systems to vehicles on the road, utility meters, shopping carts, for sale and street vendor signs, traffic signals, and much, much more.

It’s an entirely new world for local governments tasked with approving permit requests to place cellular and wireless infrastructure on private and public lands. With billions to be made managing machine-to-machine communications, smart cars, and expanded wireless internet, every player has a vested interest in making sure local governments don’t impede their potential profits.

That is why companies like AT&T are pushing hard for new limitations on local government objections to their sprouting wireless infrastructure. Their idea is to override local control and shift to their proposed statewide or federal guidelines conveniently favoring them by putting time limits on communities to contemplate an application, eliminating certain rights for local governments to object to those applications, and making certain wireless companies don’t have to pay what they consider excessive fees or taxes to local authorities for the right to use the public space.

For local governments, responsiveness to citizens who have to live next to wireless infrastructure is important, and not only because of pseudo-scientific fears of the health impacts of wireless signal radiation. Aesthetic issues alone often make or break current wireless antenna applications.

The POTs and PANs Blog notes that time is short for local communities to get their wireless infrastructure policies in place for the incoming boom of mini-cell sites and IoT networks.

Pole Refrigerators and 100-Foot Fake Pine Trees

Traditional cell towers are easy to spot because they are tall and very visible with wireless antennas often serving multiple carriers fixed up and down across the tower. The next generation of wireless networks will be powered by much smaller antennas attached to utility and light poles. In some cases where nearby trees can block signals, providers propose new 100-foot tall monopoles, sometimes disguised to resemble a tree — albeit a very, very tall one. To know how those trees could be removed with efficiency, you can learn this here now.

Some early generation “small cells” resemble a compact refrigerator and weigh several hundred pounds. These are usually mounted approximately half to two-thirds up a utility pole and are very visible. Some have loud cooling fans, others need additional infrastructure like external power that will busy-up the utility pole with more cables and supports. In a storm strong enough to take out a utility pole, you would not want to be underneath a falling “small cell.”

The Tree Trimming Flat-Top Haircut is Back

Arborists warn that some early 5G installations have taken a serious toll on nearby trees also in the right-of-way because the technology requires a direct line-of-sight to the antenna. This has resulted in aggressive tree-trimming to keep foliage far away from the small cell, and that trimming sometimes includes reducing the height of nearby trees.

A University of Surrey study found that small cells mounted 10 meters up a pole faced at least a 30% chance of having their signals blocked by trees. At 15 meters, that chance of signal blockage is reduced to 10%. At 25 meters, it is less than 1%. But that would require an 82-foot high utility pole in the neighborhood. The standard utility pole in the United States is about 40 ft (12 m) long. Either aggressive tree trimming or tall utility pole placement to avoid trimming is likely to create controversy in suburban residential neighborhoods.

City planners are being urged to contemplate what kind of enforceable policies they want to permit in the public space set aside for infrastructure, because as author Doug Dawson noted, it’s going to get busy up there:

I doubt that any city is prepared for the possible proliferation of wireless devices. Not only are there four major cellular companies, but these devices are going to be deployed by the cable companies that are now entering the cellular market along with a host of ISPs that want to deliver wireless broadband. There will also be significant demand for placement for connecting private networks as well as for the uses by the cities themselves. I remember towns fifty years ago that had unsightly masses of telephone wires. Over the next decade or two it’s likely that we will see wireless devices everywhere.

Comcast Getting Into the Wireless Mobile Business; Relies on Wi-Fi, Verizon Wireless

(Image courtesy: FCC.com)

(Image courtesy: FCC.com)

Comcast is getting into the wireless mobile business.

Comcast CEO Brian Roberts made the surprise announcement at this morning’s Goldman Sachs Communacopia investor conference, telling attendees Comcast will offer service beginning in mid-2017.

Roberts added the service will depend heavily on Comcast’s installed base of 15 million Wi-Fi hotspots, mostly from cable modem/gateways already installed in customer homes. When away from a hotspot, Comcast’s cellular service will depend on Verizon Wireless.

The deal with Verizon Wireless was expected, because Comcast has maintained an agreement with Verizon since 2011 that allows both companies to sell each other’s services to consumers. The agreement allows Comcast to obtain service from Verizon Wireless at fixed wholesale prices.

That means Comcast can introduce its wireless service without having to build wireless infrastructure like cell towers.

“We believe there will be a big payback with reduced churn, more [customer] stickiness and better satisfaction,” Roberts said.

Comcast will continue the cable industry’s tradition of not directly competing with other cable operators and will not accept customers outside of an existing Comcast service area. Comcast will likely offer the service in a bundle with other services. This will result in a quad-play package for Comcast, bundling cable TV, internet, phone, and cellular service.

Roberts did not talk about pricing.

America’s 5G Revolution Comes By Giving Wireless Industry Whatever It Wants

Wheeler

Wheeler

FCC chairman Thomas Wheeler today told an audience at the National Press Club that 5G — the next generation of wireless networks — “is a national priority, and why, this Thursday, I am circulating to my colleagues proposed new rules that will identify and open up vast amounts of spectrum for 5G applications.”

Wheeler’s proposal, dubbed “Spectrum Frontiers,” is supposed to deliver wireless connectivity as fast as fiber optic broadband, and in Wheeler’s view, will deliver competitive high-speed access for consumers.

“If the Commission approves my proposal next month, the United States will be the first country in the world to open up high-band spectrum for 5G networks and applications,” said Wheeler. “And that’s damn important because it means U.S. companies will be first out of the gate.”

Central to Wheeler’s 5G proposal is opening up very high frequency millimeter wave spectrum — for unlicensed and licensed data communications. Wheeler named two in his speech: a “massive” 14GHz unlicensed band and a 28GHz “shared band” that will allow mobile and satellite operators to co-exist.

“Consider that – 14,000 megahertz of unlicensed spectrum, with the same flexible-use rules that has allowed unlicensed to become a breeding ground for innovation,” Wheeler said.

5g“Sharing is essential for the future of spectrum utilization. Many of the high-frequency bands we will make available for 5G currently have some satellite users, and some federal users, or at least the possibility of future satellite and federal users,” Wheeler noted. “This means sharing will be required between satellite and terrestrial wireless; an issue that is especially relevant in the 28GHz band. It is also a consideration in the additional bands we will identify for future exploration. We will strike a balance that offers flexibility for satellite users to expand, while providing terrestrial licensees with predictability about the areas in which satellite will locate.”

The CTIA – The Wireless Association, America’s largest mobile carrier lobbying and trade association, is all for opening up new spectrum for the use of their members — AT&T, Verizon Wireless, Sprint, T-Mobile, among others. They just don’t want to share it. Ironically, they are calling on the FCC to regulate who gets access to what frequencies and what services can use them. They’d also appreciate federal rules restricting or preempting local officials responsible for approving where new cell towers can be located, and some form of price regulation for backhaul services would also be nice:

First, we need the right rules for high-band spectrum based on a time-tested regulatory framework. It must strike a reasonable balance for licensed and unlicensed use while promoting investment with clear service and licensing rules. We should avoid experimenting with novel spectrum sharing regimes or new technology mandates.

Second, we need the right rules to help build our 5G infrastructure. Traditional spectrum travels many miles, depending on large cell towers to transmit signals. In contrast, high-band spectrum – capable of carrying greater amounts of data –travels meters, not miles and will require the deployment of thousands of new small cells the size of smoke alarms. This network evolution requires a new infrastructure approach, and Congress, the FCC and states must streamline and simplify local siting and rights of way rules.

Wheeler recognizes that 5G services will work very differently from the 3G and 4G networks we’ve used in the past.

ctia

CTIA is the wireless industry’s biggest lobbyist and trade association.

“5G will use much higher-frequency bands than previously thought viable for mobile broadband and other applications,” Wheeler said. “Such millimeter wave signals have physical properties that are both a limitation and a strength: they tend to travel best in narrow and straight lines, and do not go through physical obstacles very well. This means that very narrow signals in an urban environment tend to bounce around buildings and other obstacles making it difficult to connect to a moving point. But it also means that the spectrum can be reused over and over again.”

In other words, think about 5G as an initially limited range wireless network that may turn out to be best suited for fixed wireless service or limited range hotspots, especially before network densification helps make 5G service more ubiquitous. The wireless industry doesn’t think Wheeler’s vision will be enough to resolve capacity issues in the short term, and is calling on the FCC to release even more low and mid-band spectrum in the 600MHz range that can travel inside buildings and offer a wider coverage area.

Wheeler’s recognition that 5G’s shorter range signals will likely require a massive overlay of new infrastructure has also opened the door for the CTIA to call on the FCC to revisit local zoning and antenna placement rules and policies, with the likely goal of preempting or watering down local authority to accept or reject where cell phone companies want to place their next small cell or cell tower. Wireless companies are also expected to push for easy access to utility poles, time limits to approve new cell tower construction applications, and pricing regulation for fiber lines needed to connect 5G infrastructure to backhaul networks.

Cell tower camouflage failure.

Cell tower camouflage failure.

On the issue of backhaul — the connection between a cell tower and the wireless carrier’s network, the FCC is planning a pro-regulatory “anchor pricing” approach to benefit wireless companies. Consumers can also relate to being overcharged for slow speed Internet access with little or no competition, but the FCC is only acting for the benefit of the wireless companies for now — the same companies that would undoubtedly complain loudly if anchor pricing was ever applied to them.

“Lack of competition doesn’t just hurt the deployment of wireless networks today, it threatens as well to delay the buildout of 5G networks with its demand for many, many more backhaul connections to many, many more antennae,” complained Wheeler. “Before the end of this year the Commission will take up a reform proposal – supported by the nation’s leading wireless carriers, save one – that will encourage innovation and investment in Business Data Services while ensuring that lack of competition in some places cannot be used to hold 5G hostage.”

While Wheeler’s goals are laudable, there are stunning examples of hypocrisy and self-interest from the wireless industry. Yet again, the industry is seeking regulatory protection from having to share spectrum with unlicensed users, existing licensees, or competitors.  No letting the “free market” decide here. Second, there are absolutely no assurances the wireless industry will deliver substantial home broadband competition. Verizon and AT&T will be effectively competing with themselves in areas where they already offer wired broadband. Is there a willingness from AT&T and Verizon to sell unlimited broadband over 5G networks or will customers be expected to pay “usage pack”-prices as high as $10 per gigabyte, which doesn’t include the monthly cost of the service itself. Offering customers unlimited 5G could cannibalize the massive profits earned selling data plans to wireless customers.

Cactus or cell tower

Cactus or cell tower

Upgrading to 5G service will be expensive and take years to reach many neighborhoods. Verizon’s chief financial officer believes 5G wireless will be more cost-effective to deploy than its FiOS fiber to the home network, but considering Verizon largely ended its deployment of FiOS several years ago and has allowed its DSL customers to languish just as long, 5G will need to be far more profitable to stimulate Verizon’s interest in spending tens of billions on 5G infrastructure. It does not seem likely the result will be $25/month unlimited, fiber-like fast, Internet plans.

Although the mobile industry will argue its investment dollars should be reason enough to further deregulate and dis-empower local officials that oversee the placement of cellular infrastructure, it would be a tremendous mistake to allow wireless carriers to erect cell towers and small cells wherever they see fit. Most small cells aren’t much larger than a toaster and will probably fit easily on utility poles. But it will likely spark another wave of pole access controversies. The aesthetics of traditional cell tower placement, especially in historical districts, parks, and suburbs, almost always create controversy. The FCC should not tip the balance of authority for tower placement away from those that have to live with the results.

The mobile industry doesn’t make investments for free, and before we reward them for investing in their networks, let’s recall the United States pays some of the highest mobile service prices in the world. The industry argues what you get in return for that $100+ wireless bill is better than ever, an argument similarly used by the cable industry to justify charging $80 a month for hundreds of channels you don’t watch or want. Therefore, incentives offered to the wireless industry should be tied to permanent pro-consumer commitments, such as unlimited 5G broadband, better rural coverage, and the power to unbundle current wireless packages and ditch services like unlimited texting many customers don’t need. Otherwise, it’s just another one-sided corporate welfare plan we can’t afford.

Frugal Sprint: Relocating Cell Towers to Public Land to Save $$$, Annoy Customers

Phillip Dampier January 18, 2016 Consumer News, Rural Broadband, Sprint, Wireless Broadband Comments Off on Frugal Sprint: Relocating Cell Towers to Public Land to Save $$$, Annoy Customers

sprint terribleSprint customers will once again have to endure service interruptions and disruptions and the possibility of degraded service after the cellular company quietly announced it was terminating leases with Crown Castle and American Tower — two of the largest owners of shared communications towers in the country, and relocating Sprint cell sites to government-owned property.

Sprint is aggressively pursuing a $2 billion cost-cutting program to stay competitive with T-Mobile, AT&T, and Verizon Wireless. Re/code reports much of this savings will come from rushing cellular antennas off shared-use cell towers and erecting antennas on public land instead, expected to cost much less. The move is “raising eyebrows” on Wall Street, as analysts grow concerned about Sprint’s exposure to early termination fees from the early end of multi-year contracts with at least two tower owners. Many are also concerned Sprint will end up placing towers in less than ideal areas, opening up coverage gaps and unanticipated negative coverage changes for customers.

Jennifer Fritzsche, senior analyst for Wells Fargo, predicts the move could “be a major step backwards on the recent progress [Sprint] has made” on its ‘brand repair’ efforts.

Sprint has been criticized for seemingly never-ending “network improvements” that have promised subscribers dramatically better service. Instead, many customers have defected to competitors like T-Mobile after their patience came to an end waiting for upgrades that never arrived. Sprint’s latest effort to save money could cost Sprint even more in additional customer defections if service deteriorates.

Penny wise, pound foolish,” is the conclusion of wireless expert Roger Entner, an analyst for Recon Analytics. “Customers don’t like surprises.”

Customers in the eastern United States and in large cities are likely to be at risk for signal degradation, if only because the government owns much less land in these areas available for Sprint’s use.

Sprint also intends to abandon much of its fiber backhaul network, now owned primarily by AT&T and Verizon. Instead, Sprint will transition to microwave backhaul service between cell towers and its network connection points, for a potential savings of $1 billion annually. The microwave approach was last taken by Clearwire, which Sprint acquired in 2012. Few, if any carriers, are expected to follow Sprint’s footsteps.

One person familiar with the initiative, dubbed the Next Generation Network, predicted another wave of network hiccups, Re/code reported. The plan is likely to result in reduced coverage in rural areas and a lot of problems for current customers as Sprint embarks on its massive tower relocation project.

“Getting there is going to be a nightmare,” said the source, who requested anonymity because he is not authorized to speak about the matter. “It’s going to be very, very disruptive.”

Search This Site:

Contributions:

Recent Comments:

Your Account:

Stop the Cap!