Home » antennas » Recent Articles:

Communities and States Tell FCC to Back Off Proposed Wireless Infrastructure Reform

States and communities across the country are warning the Federal Communications Commission its proposal to limit local authority over wireless infrastructure siting will create chaos and open the door to public safety and aesthetics nightmares.

The FCC’s proposal would allegedly accelerate wireless infrastructure deployment by removing or pre-empting what some on the Commission feel are improper zoning barriers, unjustified fees meant to deter providers from adding new towers, and various other bureaucratic impediments. It would modify current “shot clock” rules that set time limits on applications and deem them automatically granted if a local or state authority failed to reach a decision in as little as 60 days.

Pai

While the wireless industry has expressed strong support for the proposed changes introduced by FCC Chairman Ajit Pai in March during the FCC’s “Infrastructure Month,” many states and localities are fiercely opposed to what some are calling a federal government takeover of local zoning and permitting. States as diverse as Illinois, Utah, and Maine have submitted comments objecting to the proposal, noting it will turn the FCC into a national zoning agency that could allow the installation of new cell towers and monopole antennas just about anywhere if the clock for consideration has run out.

Several communities have also submitted comments to the FCC reminding the agency its existing rules have allowed some providers to abuse the system, with further easing of regulatory oversight on the local level only increasing the potential for more abuse.

Communities have complained some providers have intentionally overwhelmed local authorities by submitting “bulk applications” that attempt to win approval for dozens of new sites with incomplete or missing paperwork. Others report providers using the public rights-of-way have placed large pieces of infrastructure in direct line with residents’ front doors, have created public safety problems with equipment that blocks drivers’ views at intersections, and had to contend with requests to place 120-200 foot monopole antennas on the edge of public highways and abandoned retired infrastructure providers fail to maintain or remove.

Can you find the hidden monopole tower?

The Utah Department of Transportation, among others, calls the FCC’s proposal “detrimental to public safety” and warns the FCC could end up creating a new loophole allowing providers to submit defective applications and then stalling required corrections until the shot clock runs out.

“No decisions are made on incomplete applications because the requested information is necessary for a decision to be issued,” Utah’s DOT writes. “This information may include, but is not limited to, when and where the work will be performed, type of installation, impacts to the traffic of the state highway. All safety issues must be addressed. Any shot clock start considerations by the Federal Communications Commission must be based upon completed applications. Otherwise the telecommunications company may fail to submit a completed application and continue to not submit all the requested information until the shot clock time period has run out. Such an approach would have detrimental impacts to safety of the traveling public on state highways because the Federal Communications Commission seeks to remove any authority from the states and local governments to address safety and placement after the shot clock has run out.”

Utah also fears the FCC’s decision to set uniform fees for applications could end up subsidizing large telecom companies with taxpayer dollars.

“Any requirement mandating lower fees than the actual costs will require the states to subsidize the telecommunications industry,” Utah’s DOT warned.

Maine’s Department of Transportation worries the FCC is putting the interests of multi-billion dollar telecom corporations ahead of the citizens of the state and their own needs. By allowing telecommunications companies to win irrevocable rights to place wireless towers where they want by running out the clock, the interests of those companies overshadow the public interest.

“The only ‘right’ that any entity receives to locate within Maine’s highway corridors is a revocable permit,” the DOT wrote. “To minimize overall expense and downtime, it is essential that facilities are appropriately located the first time around and there should not be any rules stating that it is in any way appropriate for an entity to construct facilities in a location that has not been explicitly approved by the applicable licensing authority, property owner or facility owner.”

Because the FCC’s proposal is so wide-ranging and skewed in favor of telecom companies, several state and local agencies are asking the FCC to clearly affirm that a company’s business interests should never come before public safety, future transportation needs, or at the public’s expense.

“Any new or revised rules should clearly affirm a state or local highway agencies’ authority to properly manage the highway corridor in the interest of highway safety, operations, and right of way preservation for future highway purposes,” offers Maine’s DOT, adding that after the state’s experience with financially troubled telecom companies abandoning outdated or damaged infrastructure, the public should not have to pay to clean it up.

“Accommodation of wireless towers or other monopole structures within the highway corridor also present hidden public expense when relocation of those facilities cause construction delays or when such facilities are abandoned by a [company] that declares bankruptcy,” the agency noted.

The Illinois Department of Transportation echoed Utah and Maine, noting the telecom industry needed to work with local and state officials to ensure timely permitting.

Instead, the telecom industry has spent millions lobbying state and federal legislators to curtail or eliminate local oversight and control. While many telecom companies are honest and accommodating, especially when they are considering major infrastructure expansion, some are not and work to game the system.

IDOT notes it is willing to manage the burden of processing applications on a timely basis, but utilities should not be rewarded with a right to run out the clock with an incomplete application.

“The burden of timely issuance of permits is shared by both the state and the industry,” IDOT wrote. “It is important that the utility fulfill its duties and meet their obligations.”

Benjamin

In one instance, a large telecom company submitted a very large number of permit applications across Illinois for a network upgrade it had no plans to commence in the near future, overwhelming permit offices. If the FCC’s reforms were in place, many of those applications would have been automatically approved after the deadline for consideration ran out, even though the provider was in no hurry to start work.

“The concept behind this is […] if a government authority doesn’t respond in a timely manner, the permit is automatically granted,” the filing said. “The [proposal] is attempting to shift the burden of court appeal to the [local permitting authority] as opposed to the permit applicant.”

Columbia, S.C. mayor Steve Benjamin believes the FCC is trying to solve a non-existent problem.

“Simply put, local rights-of-way management does not discourage wireless deployment,” Mayor Benjamin said in March. “Instead, it serves numerous public policy goals and ensures that rights-of-ways are managed in a manner that allows for all users to safely and efficiently use public rights-of-way. The city is deeply concerned […] the Commission is simply seeking to preempt local authority and to dictate how local governments should manage public property, all in an effort to marginally increase the profits of an already profitable industry at the expense of important and legitimate public interest goals.”

Communities Prepare for Onslaught of New Wireless Networks in Public Rights-of-Way

Phillip Dampier June 12, 2017 Public Policy & Gov't, Wireless Broadband 1 Comment

AT&T’s idea of a small cell deployment on an existing utility pole in Oakland, Calif. (Image courtesy: Omar Masry, a city planner living in the area, who warns other city planners: “Don’t let this happen to you.”)

Some of America’s biggest wireless telecom companies are spending millions lobbying Washington and state legislatures for the right to place a myriad of new wireless transmitters and small cells in the public rights-of-way without local communities having much say about where they go and what they look like.

Utility Traffic Jam

Over the next five years, tens of thousands of new “small cell” devices are expected to be placed on utility poles to manage forthcoming wireless services, and that represents a conservative estimate. Every major wireless carrier is contemplating new line-of-sight 5G communications networks that will require a massive deployment of new wireless antennas that will serve a smaller audience of devices than traditional cell towers have. But wireless companies will not be alone. Cable operators are also expected to enter the wireless business, not only to resell other providers’ cellular services but also to deploy new low power, line of sight networks to manage the Internet of Things (IoT), which will wirelessly connect devices ranging from home appliances and heating/cooling systems to vehicles on the road, utility meters, shopping carts, for sale and street vendor signs, traffic signals, and much, much more.

It’s an entirely new world for local governments tasked with approving permit requests to place cellular and wireless infrastructure on private and public lands. With billions to be made managing machine-to-machine communications, smart cars, and expanded wireless internet, every player has a vested interest in making sure local governments don’t impede their potential profits.

That is why companies like AT&T are pushing hard for new limitations on local government objections to their sprouting wireless infrastructure. Their idea is to override local control and shift to their proposed statewide or federal guidelines conveniently favoring them by putting time limits on communities to contemplate an application, eliminating certain rights for local governments to object to those applications, and making certain wireless companies don’t have to pay what they consider excessive fees or taxes to local authorities for the right to use the public space.

For local governments, responsiveness to citizens who have to live next to wireless infrastructure is important, and not only because of pseudo-scientific fears of the health impacts of wireless signal radiation. Aesthetic issues alone often make or break current wireless antenna applications.

The POTs and PANs Blog notes that time is short for local communities to get their wireless infrastructure policies in place for the incoming boom of mini-cell sites and IoT networks.

Pole Refrigerators and 100-Foot Fake Pine Trees

Traditional cell towers are easy to spot because they are tall and very visible with wireless antennas often serving multiple carriers fixed up and down across the tower. The next generation of wireless networks will be powered by much smaller antennas attached to utility and light poles. In some cases where nearby trees can block signals, providers propose new 100-foot tall monopoles, sometimes disguised to resemble a tree — albeit a very, very tall one. To know how those trees could be removed with efficiency, you can learn this here now.

Some early generation “small cells” resemble a compact refrigerator and weigh several hundred pounds. These are usually mounted approximately half to two-thirds up a utility pole and are very visible. Some have loud cooling fans, others need additional infrastructure like external power that will busy-up the utility pole with more cables and supports. In a storm strong enough to take out a utility pole, you would not want to be underneath a falling “small cell.”

The Tree Trimming Flat-Top Haircut is Back

Arborists warn that some early 5G installations have taken a serious toll on nearby trees also in the right-of-way because the technology requires a direct line-of-sight to the antenna. This has resulted in aggressive tree-trimming to keep foliage far away from the small cell, and that trimming sometimes includes reducing the height of nearby trees.

A University of Surrey study found that small cells mounted 10 meters up a pole faced at least a 30% chance of having their signals blocked by trees. At 15 meters, that chance of signal blockage is reduced to 10%. At 25 meters, it is less than 1%. But that would require an 82-foot high utility pole in the neighborhood. The standard utility pole in the United States is about 40 ft (12 m) long. Either aggressive tree trimming or tall utility pole placement to avoid trimming is likely to create controversy in suburban residential neighborhoods.

City planners are being urged to contemplate what kind of enforceable policies they want to permit in the public space set aside for infrastructure, because as author Doug Dawson noted, it’s going to get busy up there:

I doubt that any city is prepared for the possible proliferation of wireless devices. Not only are there four major cellular companies, but these devices are going to be deployed by the cable companies that are now entering the cellular market along with a host of ISPs that want to deliver wireless broadband. There will also be significant demand for placement for connecting private networks as well as for the uses by the cities themselves. I remember towns fifty years ago that had unsightly masses of telephone wires. Over the next decade or two it’s likely that we will see wireless devices everywhere.

The Great TV Channel Repack: See Where Your Stations Are Headed

Phillip Dampier April 17, 2017 Consumer News, Public Policy & Gov't Comments Off on The Great TV Channel Repack: See Where Your Stations Are Headed

As the wireless industry grabs a bigger chunk of the television dial, the remaining free over-the-air stations are going to be on the move starting next year. More than 900 American television stations will get new channel numbers after the move is complete, all to squeeze signals into the unchanged VHF and diminished UHF dial.

The folks at Rabbit Ears have a handy tool that will guide you through the changes, and they are enormous. Just use the drop-down box next to “Market” and find your city. Here at Stop the Cap! HQ, all but two stations in Rochester, N.Y., are getting new channel positions:

TV station reassignments as a result of the channel repack for Rochester, NY. The first two columns show the new vs. current actual channel number.

Most viewers won’t notice a big difference because the FCC is allowing stations to continue to market themselves with a virtual channel number than usually dates back to before the migration to digital TV broadcasting. But the channel changes can still be important for viewers using an antenna, especially if your local station(s) migrate into the VHF or UHF bands where they might not have been before. Two different antennas are sometimes required to get good reception from both bands. The traditional “rabbit ears” indoor telescoping antenna is usually designed for VHF reception, while small loop antennas work better for UHF. Various other antenna configurations can work for both bands, some better than others. Outdoor aerials can be designed to receive VHF, UHF or both. You may need an antenna upgrade if your antenna isn’t designed to receive the station(s) you want to see after they move.

Vandals Cause $1 Million in Damages Collapsing AT&T Cell Tower in Texas

att_logoOne of AT&T’s cell towers in Denison, Tex. went missing last Thursday in the 1900 block of West Crawford St. after vandals cut the tower’s supporting guy wires, causing it to collapse.

Nearby residents woke up to find the remains of the tower crumpled on the ground, with dramatically poorer cell service the result for AT&T, Sprint, and T-Mobile customers in the immediate vicinity. All three mobile providers maintained antennas on the affected tower.

Denison Police say the incident was a clear case of vandalism. After the guy wires were intentionally cut, the tower lacked sufficient support to stay standing on its own.

Nobody was injured during the collapse, but AT&T says the vandals caused $1 million in damages. A temporary cell tower is now in place. It will take three months to permanently replace the cell tower.

AT&T is offering at least a $7,500 reward for information that leads to an arrest.

[flv]http://www.phillipdampier.com/video/KXII Sherman ATT cell tower felled in Denison 11-22-2015.mp4[/flv]

KXII in Sherman, Tex. reports Denison authorities are looking to arrest the vandal(s) that destroyed an AT&T cell tower. (1:30)

Thurman, N.Y.’s Rural ‘White Space’ Wireless Network Debuts; Speed, Capacity Blows DSL and Satellite Away

The national map of available white space channels show plenty are available in rural areas, but designing an urban network might prove challenging because open channels just don't exist.

The national map of available white space channels show plenty are available in rural areas, but designing an urban network might prove challenging because open channels often just don’t exist. In a medium-sized city like Rochester, only 11 UHF channels are available, a number likely to dwindle to close to zero if the FCC successfully reallocates much of the UHF band to wireless providers like AT&T and Verizon.

A dozen homes in the middle of the Adirondacks now have access to Internet speeds far faster than what Verizon and Frontier DSL can deliver and without the usage caps or speed throttling common with satellite Internet access.

Thurman, N.Y.’s public-private “white space” wireless network survived months of political wrangling, debate, and even intentional signal interference created by someone intent on disrupting the project. For a community that some maps depict with zero residents, the 1,200 people of Thurman are now more known than ever, winning national attention for one of the first next generation rural wireless networks to use unused space on the UHF dial to provide Internet access.

A dozen homes are the first to receive the service, with nearly 80 more on the way during phase one of the project. A $200,000 New York state broadband grant helped get the project off the ground and defray the cost of equipment installed in each subscriber’s home. But the initial cost isn’t cheap, even with the grant. New customers pay an upfront equipment fee of $292 for a receiver that costs the project up to $600. The monthly service charge is $50. Despite the price, it’s worth it to a lot of subscribers.

“The white space service is truly amazing,” said John Schroeter of Kenyontown, noting he uses the Internet for genealogical research and relied on dial-up access for the last 15 years. “I can go from one web page to another without waiting forever.”

Schroeter told Denton Publications that web pages often failed to load with dial-up, even after hours of waiting. Now he can manage to complete days of research in about an hour, without having to drive 15 miles to the nearest Wi-Fi hotspot.

Despite the fact Verizon and Frontier Communications both run their own fiber cables on the same utility poles in the region, at least 75% of the 400 homes in Thurman have no access to broadband Internet, living out of reach of even basic DSL. Many end up in the parking lot of the town hall to use Wi-Fi. Others depend on prohibitively expensive satellite access. None of the existing options were ideal. Sheila Flanagan, proprietor of Nettle Meadow Farm complained it took her hours to prepare even a small number of shipping labels to send her cheese products across the country with UPS. Speeds were so slow, she was forced to drop Williams-Sonoma as a client.

thurmanThe concept of white space wireless Internet access has already taken hold in Europe but has dragged in the United States as existing UHF television stations, wireless carriers, wireless microphone manufacturers and others who use the same frequencies white space data services also depend on defend their turf. Since white space services are unlicensed and intended for two-way communications, fears that Internet users would degrade wireless microphones or TV reception meant special care had to be taken to lower the potential for interference.

Since rural areas lack a crowded television dial, are often outside of the coverage areas of wireless carriers, and are unlikely to host many wireless mics, white space broadband would seem like the natural solution.

The project in Thurman faced a number of obstacles to overcome anyway. There were philosophical objections from tea party conservatives who objected to tax dollars paying for the “luxury” of Internet access when satellite service is available. Some residents wanted a fiber to the home solution, one that was likely financially out of reach for the small community. Still others wanted the money spent on a fiber link between the town and Time Warner Cable, that might then be enticed to wire homes in the rural community. In the end, the community decided to go ahead with an advanced wireless network, citing a number of factors familiar to many living in rural areas:

  1. thurman-nySince the town is located entirely within the Adirondack Park, there are prohibitions on placing communications towers on nearby peaks or other high spots that could spoil the view;
  2. The heavily forested and mountainous area made a traditional Wireless ISP project difficult because those networks need line of sight communications. White space wireless signals easily penetrate through trees and can stay intact across hilly terrain;
  3. Although not as bandwidth capable as fiber optics, white space networks are capable of delivering 10Mbps broadband per UHF channel. Most networks bond multiple UHF channels together to support even faster speeds and expand capacity;
  4. The chances of creating interference for other spectrum users was low in Thurman, which is a four-hour drive from New York and far enough north of Albany to avoid interfering with signals from the state capital. Even wireless carriers hug their cell towers along I-87, a respectable distance away;
  5. The network has redundant backhaul access to fiber from both Verizon and Frontier, neither of which show the slightest interest in expanding services into the community on their own;
  6. The grant was limited in scope and white space broadband qualified so it proved the most economical choice for a community that was no stranger to fights over money, engaging in political battles over issues like the cost of building a salt shed and auditing the on-hand count of trash bags.
The Thurman white space broadband project hides base station antennas in the tree canopy.

The Thurman white space broadband project hides base station antennas in the tree canopy.

Tests provided the project managers with an idea where to place needed wireless antennas, often hidden within tree canopies. But at least one disgruntled resident made a point of creating intentional interference on the channels the project managers were testing, committing a federal offense along the way. That was quickly overcome and the equipment has been placed and will soon be joined by installations in nearby neighborhoods, broadening the reach of the service.

Recent advancements in white space technology have also allowed speed and capacity to improve dramatically. Equipment now transmits its exact GPS-identified location to a national database which sends back an authorized list of “white space” channels each transmitter can use to provide the service. If a new licensed broadcaster takes to the airwaves, a database update will lock out that channel in the area, preventing interference.

Although exact speed data was not available at press time, Sally Feihel demonstrated she could successfully stream an episode of a classic Andy Griffith Show on her iPod at the same time a videoconference was underway and someone else was downloading a movie, all without skipping a beat. In fact, there is so much speed and capacity built into the system, its managers say speed throttles and usage caps are completely unnecessary.

Most users agreed the wireless network far outpaced satellite and DSL and some believed it was even faster than Time Warner Cable Internet access they experienced elsewhere. (Time Warner Cable doesn’t come near the community today.)

Constructing the network only took several months, but the politics that often surrounds public-private initiatives and the need for grant funding in income-challenged rural America can tie up projects much longer than that. The need for decent and affordable Internet access often will cross party lines, especially in rural communities.

New York’s state broadband expansion fund could help expand similar projects to other bypassed areas of the state. That investment may actually save taxpayers from paying high broadband bills indefinitely.

Residents are eagerly waiting for the next expansion to begin down Valley, Garnet Lake and Glen-Athol Roads. Moving beyond that may take more grant funding.

“White space is saving us $90 per month, and it’s far faster than satellite ever was,” another resident said.

[flv]http://www.phillipdampier.com/video/MetroFocus A New way to Bring Broadband to Rural Towns in Upstate New York 2014.mp4[/flv]

MetroFocus showed the initial planning and testing phases of Thurman’s new white space wireless network, including interviews with town officials and a tour of the community. (4:23)

[flv]http://www.phillipdampier.com/video/Dynamic Spectrum in Action How TV White Space Devices Work.mp4[/flv]

TV white space wireless broadband networks are designed to avoid interference with other licensed spectrum users. See how the technology works in this short video. (2:27)

Search This Site:

Contributions:

Recent Comments:

Your Account:

Stop the Cap!