Home » Rural Broadband » Recent Articles:

Slow Broadband = Low Usage, Finds New Study

Phillip Dampier June 15, 2016 Broadband Speed, Consumer News, Online Video, Rural Broadband Comments Off on Slow Broadband = Low Usage, Finds New Study

kcl-logoHow much you use the Internet is often a matter of how fast your broadband connection is, according to a new study.

King’s College London researchers found a clear correlation between bad broadband and low usage rates, as customers avoided high bandwidth apps like online video because they were frustrating or impossible to use. One analyst said the findings show rural areas are being “deprived of the full benefits of broadband.”

One of Britain’s most used apps is the BBC iPlayer, which streams live and on-demand programming from multiple BBC radio and television networks. It is a well-known bandwidth consumer, using a significant proportion of a customer’s broadband connection to deliver up to HD-quality video streams. The study found users in South Ayrshire, Ards, the Isle of Wight, the East Riding of Yorkshire, North Down and Midlothian were among the areas where people used iPlayer the least. It wasn’t because they didn’t want to. Those areas were identified by Ofcom, the British telecom regulator, as receiving some of the worst Internet speeds in the UK. Conversely, areas with robust broadband, including London, south Gloucestershire and Bristol, showed above average usage.

Dr. Sastry

Dr. Sastry

“It is clear that high-speed broadband is an important factor in the use of bandwidth-intensive applications such as BBC iPlayer,” said Dr. Nishanth Sastry, a senior lecturer at King’s College London and the lead researcher. “With technological advancements, it is likely that more services important to daily life will move online, yet there is a significant proportion of the population with inadequate broadband connections who won’t be able to access such services.”

Ian Watt, a telecommunications consultant with the analyst Ovum, said broadband speeds must get higher to assure users can watch HD video and simultaneously share their Internet connection with other members of the household.

“Recent Ovum research indicated a speed of 25Mbps was an appropriate target access speed to provide a high quality experience for video services,” Watt said. In the United States, 25Mbps is the current minimum speed to qualify as broadband, according to the most recent FCC definition.

The findings may also explain why U.S. broadband providers only capable of delivering relatively low-speed Internet access report lower average usage than those capable of providing service at or above 25Mbps. Those offering the fastest speeds are also the most likely to attract higher volumes of Internet traffic as customers take advantage of those speeds.

Middle Mile Madness: Rural Florida Blows $24 Million on Wireless Network Serving Nobody

12126179-florida-rural-broadband-alliance-logoA word to the wise: using public money to build a middle mile broadband network without any customers lined up to sign up is a disaster waiting to happen.

In April, the disaster arrived in the form of a Chapter 7 bankruptcy filing on behalf of the Florida Rural Broadband Alliance (FRBA), which threw away $24 million in federal grants on a network that was so unviable, the contractor that was supposed to run it apparently ran away instead, resulting in confusion and an eventual declaration it was “doomed to fail” anyway.

The sordid story started almost seven years ago when Florida’s Heartland Regional Economic Development Initiative (FHREDI) and Opportunity Florida (OF) — two non-profit organizations dedicated to spurring economic development across rural Florida, discovered federal grant money was available for rural Internet expansion as part of the Obama Administration’s 2009 American Recovery and Reinvestment Act. The two groups fashioned a broadband proposal they were confident would win approval. At the time, rural broadband across northwest and south-central Florida was dismal at best, with only 39% of homes covered. Largely unserved by cable and barely served with DSL from AT&T and other telephone companies, the two groups believed a wireless network would be the best solution for Hardee, DeSoto, Highlands, Okeechobee, Glades, Hendry, Holmes, Washington, Jackson, Gadsden, Calhoun, Liberty, Gulf and Franklin counties.

empty-office

$24 million spent and nothing to show for it.

Although $24 million is not an insubstantial sum, it was clearly never adequate to build a comprehensive rural broadband network reaching homes and businesses. Instead, the two groups envisioned a “middle mile” network funded by the government, with central offices in Orlando and Tallahassee equipped with microwave dishes and computer servers. Unlike most middle mile networks, the one proposed by the FRBA would rely on a network of microwave towers instead of fiber optics, and would ultimately serve all of its customers over a wireless network.

When complete, the wireless network was supposed to deliver up to 1Gbps capacity throughout the region, relying on leased space on existing cell towers to support microwave links that would bounce signals from one area to the next. Initially promising to serve more than 174,000 homes and 16,400 businesses, the one immediate flaw noticed by those skeptical of the proposal was the lack of a definitive plan to sell Internet service to paying residential and business customers. The brochures suggested existing commercial Internet Service Providers would magically step into that role. Early critics called that “wishful thinking.”

Despite what some felt was an untenable business plan and an incomplete application, the group won its federal “BTOP” grant of $24 million in 2010 and began a very lengthy planning process using well-paid consultants to get the network fully scoped out and built. Within a year, controversy quickly threatened to swamp the project, and a congressional oversight investigation quickly found evidence of wasteful spending and put its funding on hold. That would hardly be the first allegation raised against the FRBA and those overseeing it. By 2013, the Columbia County Observer had run more than a dozen stories reporting irregularities and other problems with the project. Few were noticed more than the report Rapid Systems, Inc., one of the contractors on the project, had filed a $25 million lawsuit replete with soap operatic allegations against FRBA for not being paid for its work.

Rapid Systems CEO, Dustin Jurman and CFO/VP Denise Hamilton. (Image: Columbia County Observer)

Rapid Systems CEO, Dustin Jurman and CFO/VP Denise Hamilton. (Image: Columbia County Observer)

Rapid Systems alleged everything from fraud and double-dipping to sexual promiscuity over what it called the “FRBA Fraud Scheme.”

At the heart of the lawsuit were allegations money was being misspent, “to pay inflated salaries to employees, who then fled to South America, and that grant money was used for inflated fees to consulting companies which were owned by FRBA principals.”

Rapid Systems claimed FRBA was very generous paying management consulting fees of $10,000 a month to an entity known as the Government Service Group (GSG), along with a pro rata share (3% of the grant) for a “Grant Compliance Fee” and an additional 13% of the grant as a “Capital Improvement Program Administrative Fee.” And you thought only Comcast and Time Warner Cable were creative conjuring up fees. When added up, it appeared just one consultant — GSG — would walk away with 16% of the entire grant — nearly $4 million in total “management fees” before a single broadband connection would be made.

The lawsuit also claimed the grant money was gorged on by the leadership of both non-profits, one who allegedly relocated to South America the lawsuit states in another aside. The two “were being paid fees in the amount of $8,500 a month to themselves cloaked as administrative and community outreach funds,” according to the lawsuit.

Phillip Dampier: To be a credible supporter of community broadband, it is responsible to call out the disasters so that they are not repeated.

Phillip Dampier: To be a credible supporter of community broadband, it is responsible to call out the disasters so they are not repeated.

Meanwhile, the public eagerly awaiting something better than the non-broadband AT&T and some independent phone companies were supplying in the region couldn’t get answers about the project’s progress. Neither could the media, which reported the business phone number for the FRBA would ring unanswered for hours or days. Those hired to provide community outreach about the broadband project were frequently unable to answer even basic questions about the network or its status, or where the principals involved in the project even met.

By 2014, Opportunity Florida’s Facebook page claimed the network was 90% complete. But the project now decidedly downplayed how many homes and businesses would get service. Instead, the middle mile network promoted itself as an institutional network, dedicated primarily to serving “community anchor institutions:”

The FRBA system provides lower cost, high capacity broadband to Community Anchor Institutions, commonly referred to as “CAIs.” CAIs include local government and public agencies including schools, libraries and hospitals. The NTIA grant was initiated with these unserved or underserved CAIs as the intended target. Most government and public services have moved, or are in the process of moving, to paperless transactions and record-keeping and need the additional broadband and Internet based capabilities. Another benefit of the FRBA system will be capacity to schools and libraries as both those institutions face online and digital mandates.

Commercial ISPs willing to use the network to offer service to individual non-institutional customers were invited to visit an Opportunity Florida webpage (now gone) for more information. There is no evidence any major ISP ever bothered. In fact, even institutional users didn’t seem very interested. We remain unclear if there was ever a single paying customer on the network, despite a report filed by the NFBA with the federal government that claimed through September 30, 2012, the NFBA had 11 anchor institutions, zero residents, and zero businesses hooked up to its network.

A year later, the Columbia County Observer went further and called some of those involved in evangelizing the project “clueless,” and based on the post-mortem of what has happened since, they may be right.

Those directly involved in the project have since displayed a stunning lack of knowledge about its operations and practices, or what has become of the $24 million:

The unfortunate "I see nothing, I hear nothing, I know nothing" brigade.

The unfortunate “I see nothing, I hear nothing, I know nothing” brigade answers questions from the media.

  • Gina Reynolds, the last executive director of FHREDI, which administered FRBA, claimed the network was running fine when she left in the summer of 2015 to start her own economic development consultancy. She may be among the very few that got out before the project ultimately fell apart. Although FHREDI managed to pay her for her services, it suddenly lacked any resources to pay anyone to replace her after she left;
  • Greg Harris, a Highlands County commissioner and FHREDI director, disclosed at a recent county commission meeting FRBA was in Chapter 7 bankruptcy and the group that oversaw it — FHREDI, was being dissolved. But like the phoenix rising from the ashes, some of those involved in FHREDI and FRBA are now associating themselves with a new group called the Florida Heartland Economic Region of Opportunity (FHERO). Says Harris: “We didn’t really know what FHREDI was doing. They were spending most of their opportunity on FRBA and the rural broadband. It got away from what we really needed to focus on.”
  • Terry Burroughs, an Okeechobee County commissioner, is FHERO’s chairman. But last year, the ex-telephone company executive was a FHREDI board member. His memory is excellent about where the taxpayer-funded equipment to run the network eventually ended up: in warehouses in Lake Placid and Tallahassee. But his answers were more vague when asked how things went so wrong. Burroughs tried to put substantial distance between himself and the failed wireless broadband network: “When I first got on the board, they were trying to negotiate with a contractor. Gina [Reynolds] was working with that, and it went on and on and on. There was probably a network at some given time, but I don’t think a last mile ever deployed. When I got there, the last mile was dark. … I never knew of a paying customer. They were trying to build a telephone company, and they were doomed to failure.”
  • Paul McGehee, business development manager for Glades Electric and a FHERO director, did an even better job explaining he knew nothing, saw nothing, and heard (almost) nothing: “The operator who was contracted to run it as a company stepped away from it,” McGehee said, adding he could not recall the contractor’s name. The flaw in FRBA’s plan, according to McGehee, was that while the grant bought the equipment, there were no federal funds for operations. “No one wanted to step up and operate the network, and there was no way to pay the tower leases… The end product wasn’t a viable sustainable thing.”

fhrediToo bad nobody bothered to consider that before spending $24 million of the taxpayers’ money on a non-viable network.

Commissioner Jim Brooks didn’t seem too bothered by the admissions of total failure. After hearing an explanation about the network’s demise and the money spent on it, he told his fellow commissioners he “didn’t have a problem with it.”

A multitude of articles that have documented this disaster (including our own from September 2011) illustrates what can happen when over-enthusiastic consultants overwhelm projects with happy talk not recognized as such by a board that has little or no understanding of the technology, the broadband business, or, in this case, the project itself. The claims and projections consistently simply bore no reality… to reality. What is even more concerning is some of those consultants didn’t work for free, and may have tapped a substantial portion of the total available grant for themselves.

It is also remarkable and disappointing to read candid assessments about a project “doomed to failure” from those with direct knowledge and or involvement only after the liquidator from the federal government turns up. As stewards of public taxpayer money, one expects more than a shrug of the shoulders and a quiet shuffle dance out of FHREDI into a new, reincarnated “rural economic development” initiative. How can we trust the same mistakes won’t be made again?

We remain strong supporters of community broadband, but messes like this hand potent ammunition to corporate-ISP-funded think tanks that use these kinds of failures to sully all public broadband projects. We must call out of the bad ones to be seen as credible supporting the good ones. It also never hurts to learn from others’ mistakes.

Among the biggest reasons this project was a flop (beyond the dubious skills of those in charge of overseeing it) was its size, scope, and technology choice. The biggest challenge to any rural broadband project is always “the last mile” — the point where the connection leaves a regional fiber network and reaches a nearby neighborhood’s utility poles and finally enters your home. It also happens to be the most costly segment of the network, and often the hardest to fund with government subsidies. But it is the one that makes the difference for individual homeowners and businesses who either have broadband or don’t.

Rural Floridians endure more broken promises for better broadband.

Rural Floridians endure more broken promises for better broadband.

Like too many middle mile projects of this type, the story initially fed to the press and supporters is that such networks will somehow alleviate rural broadband problems. Only later do supporters realize they are actually getting an institutional middle mile network that will offer service to hospitals, schools, and public safety buildings — not to homes and businesses. Ordinary citizens cannot access such networks unless a commercial ISP shows interest in leasing it to resell, which is unlikely. The closest most will ever get to experiencing an institutional network they paid for is staring at the fiber cable stretched across the utility poles in front of your house.

FRBA was too ambitious in size and scope, and a credible consultant should have advised those in charge to get credible evidence that a network built with grant money could be sustained without it going forward. If not, scale back the project or don’t apply for the grant.

This project proposed a wireless backbone to power a large regional wireless network. Winning support among anchor institutions was predictably difficult, because many already have existing contracts with commercial telecom companies. With government funding available in many instances, an institution can get full fiber or metro Ethernet service easier than a rural farmer can get 6Mbps DSL from a disinterested phone company.

The evidence shows there were few takers — institutional or otherwise — of what FRBA had to offer. Did the project organizers not see this lack of interest as a problem as the network prepared to launch? After launch, there were almost immediate signs it lacked enough of a customer base to sustain itself. Did the project backers assume the government would bail out the network or dump millions more into it to make it viable to sell to homes and businesses? Such assumptions would have been irresponsible.

There are too many underutilized middle mile or institutional fiber networks already built with taxpayer dollars that remain off-limits to those who paid to build them. Utilizing those networks by extending grant funding for last mile projects would be helpful, as would sufficient subsidies to assure middle mile construction is followed by last mile construction and actual service. We remain big believers in fiber to the home service. Although expensive, such projects are best positioned for success and future viability and can take advantage of the massive amount of dark fiber already laid in many areas. Some cities prefer to run the networks themselves, others contract day-to-day operations out to independent operators. Either would be preferable to a network that took six years to build and fail, without any evidence it could attract, support and sustain enough customers to support anything close to viability.

Time Warner Cable Says Tiny North Carolina Power Co-Ops Are Bullies

twc repairTime Warner Cable says it is forced to pay monopoly rates to rent space on North Carolina’s publicly owned utility poles and it now wants the state government to settle the issue by regulating prices to better reflect actual costs.

The cable company is suing five rural, member-owned electric cooperatives at the North Carolina Utilities Commission, claiming the tiny utilities are bullies that routinely stonewall, coerce, retaliate and strong-arm the country’s second largest cable company into paying up. Time Warner Cable claimed when it refused to pay one co-op’s rate demands in full, the utility threatened to add the unpaid fees to Time Warner’s electric bill and eventually cut off electricity if it went unpaid. The cable company also claims it has faced penalty fees in the millions of dollars and in one case, a threat to call the local sheriff on a cable technician repairing a line during a service outage.

The News & Observer reports the public utilities and cable operator are at an impasse. Rural utilities claim they are being undercut by a federal rate formula that many for-profit, investor-owned utilities subscribe to that requires cable companies to pay $5-7 per pole per year in rental fees. But many rural co-ops have substantially higher costs, do not generate their own electricity, have wiring and poles stretched between significantly fewer customers and don’t set rates and policies with an aim to compensate investors and shareholders.

Project4.qxdThe five public utilities each serve between 26,800-122,000 customers. Altogether, the five maintain 75,000 utility poles now involved in the dispute. All charge considerably more for pole rentals than Duke Energy, the state’s largest for-profit utility, which gets somewhere between $5-7 a year for each pole. Co-ops South River EMC is seeking $17.40 per year. Carteret-Craven EMC wants $23.60 a year.

The National Rural Electric Cooperative Association explains the disparity in rates is the result of the higher risks co-ops face if the local cable company gets sloppy and damages the pole or creates operational or safety issues.

CCEC Slide“In order to maintain 501(c)(12) cooperative tax-exempt status, cooperatives charge cost-based rates for their services, including pole attachments,” claims NRECA. “Some costs are difficult to identify and quantify, especially operational or safety issues that improper pole attachments may cause. If a federal uniform rate pushed attachment rates lower than actual costs, member owners of the not-for profit electric co-op would wind up subsidizing cable, broadband and telecommunications corporations, many of which are for-profit entities.”

NRECA claims the federal pole attachment rate formula that Time Warner Cable now advocates be applied across North Carolina was set artificially low to promote rural broadband expansion by enticing cable operators to wire areas they have never wired before. While that may sound good for rural consumers looking for cable broadband service, electric ratepayers could end up subsidizing the cable company’s expansion through higher electricity rates to recoup unpaid pole expenses. The electric co-op group also argues that even with artificially low pole attachment rates, that doesn’t guarantee cable companies will actually invest the savings into service expansion or lower prices for their customers.

Ironically, cable operators like Time Warner Cable that show little interest in sharing their infrastructure with others argue rural co-ops should be forced to share their poles.

“Once cable operators have constructed their aerial networks on existing pole infrastructure,” Time Warner wrote, “they are essentially captive because it would be prohibitively expensive and impractical (or impossible) to rebuild those networks underground or to install their own poles.”

Spring 2016: An Update and Progress Report for Our Members

stcDear Members,

We have had a very busy winter and spring here at Stop the Cap! and we thought it important to update you on our efforts.

You may have noticed a drop in new content online over the last few months, and we’ve had some inquiries about it. The primary reason for this is the additional time and energy being spent to directly connect with legislators and regulators about the issues we are concerned about. Someone recently asked me why we spend a lot of time and energy writing exposés to an audience that almost certainly already agrees with us. If supporters were the only readers here, they would have a point. Stop the Cap! is followed regularly by legislators, regulators, public policy lobbyists, consumer groups, telecom executives, and members of the media. Our content is regularly cited in books, articles, regulatory filings, and in media reports. That is why we spend a lot of time and energy documenting our positions about data caps, usage billing, Net Neutrality, and the state of broadband in the United States and Canada.

A lengthy piece appearing here can easily take more than eight hours (sometimes longer) to put together from research to final publication. We feel it is critical to make sure this information gets into the hands of those that can help make a difference, whether they visit us on the web or not. So we have made an extra effort to inform, educate, and persuade decision-makers and reporters towards our point of view, helping to counter the well-funded propaganda campaigns of Big Telecom companies that regularly distort the issues and defend the indefensible.

Four issues have gotten most of our attention over the last six months:

  1. The Charter/Time Warner Cable/Bright House merger;
  2. Data cap traps and trials (especially those from Comcast, Blue Ridge, Cox, and Suddenlink);
  3. Cablevision/Altice merger;
  4. Frontier’s acquisition of Verizon landlines and that phone company’s upgrade plans for existing customers.

We’ve been successful raising important issues about the scarcity of benefits from telecom company mergers. In short, there are none of significance, unless you happen to be a Wall Street banker, a shareholder, or a company executive. The last thing an already-concentrated marketplace needs is more telecom mergers. We’re also continuing to expose just how nonsensical data caps and usage-based billing is for 21st century broadband providers. Despite claims of “fairness,” data caps are nothing more than cable-TV protectionism and the further exploitation of a broadband duopoly that makes it easy for Wall Street analysts to argue “there is room for broadband rate hikes” in North America. Stop the Cap! will continue to coordinate with other consumer groups to fight this issue, and we’ve successfully convinced at least some at the FCC that the excuses offered for data caps don’t hold water.

Dampier

Dampier

FCC chairman Tom Wheeler’s broadening of Charter’s voluntary three-year moratorium on data caps to a compulsory term as long as seven years sent a clear message to broadband providers that the jig is up — data caps are a direct threat to the emerging online video marketplace that might finally deliver serious competition to the current bloated and overpriced cable television package.

Wheeler’s actions were directly responsible for Comcast’s sudden generosity in more than tripling the usage allowance it has imposed on several markets across the south and midwest. But we won’t be happy until those compulsory data caps are gone for good.

More than 10,000 Comcast customers have already told the FCC in customer complaints that Comcast’s data caps are egregious and unfair. Considering how unresponsive Comcast has been towards its own customers that despise data caps of any kind, Comcast obviously doesn’t care what their customers think. But they care very much about what the FCC thinks about regulatory issues like data caps and set-top box monopolies. How do we know this? Because Comcast’s chief financial officer this week told the audience attending the JPMorgan Technology, Media and Telecom Broker Conference Comcast always pays attention to regulator headwinds.

“I think it’s our job to make sure we pivot and react accordingly and make sure the company thrives whatever the outcome is on some of the regulatory proposals that are out there,” said Comcast’s Mike Cavanagh. We suspect if Chairman Wheeler goes just one step further and calls on ISPs to permanently ditch data caps and usage billing, many would. We will continue to press him to do exactly that.

Stop the Cap! supports municipal and community-owned broadband providers.

Stop the Cap! supports municipal and community-owned broadband providers.

Other companies are also still making bad decisions for their customers. Besides Comcast’s ongoing abusive data cap experiment, Cox’s ongoing data cap trial in Cleveland, Ohio is completely unacceptable and has no justification. The usage allowances provided are also unacceptably stingy. Suddenlink, now owned by Altice, should not even attempt to alienate their customers, particularly as the cable conglomerate seeks new acquisition opportunities in the United States in the future. We find it telling that Altice feels justified retaining usage caps on customers in smaller communities served by Suddenlink while denying they would even think of doing the same in Cablevision territory in suburban New York City. Both Suddenlink and Cablevision have upgraded their networks to deliver faster speed service. What is Altice’s excuse about why it treats its urban and rural customers so differently? It frankly doesn’t have one. We’ll be working to convince Altice it is time for Suddenlink’s data caps to be retired for good.

We will also be turning more attention back on the issue of community broadband, which continues to be the only competitive alternative to the phone and cable companies most Americans will likely ever see. The dollar-a-holler lobbyists are still writing editorials and articles claiming “government-owned networks” are risky and/or a failure, without bothering to disclose the authors have a direct financial relationship to the phone and cable companies that don’t want the competition. We will be pressing state lawmakers to ditch municipal broadband bans and not to enact any new ones.

We will also continue to watch AT&T and Verizon — two large phone companies that continue to seek opportunities to neglect or ditch their wired services either by decommissioning rural landlines or selling parts of their service areas to companies like Frontier. AT&T specializes in bait-n-switch bills in state legislatures that promise “upgrades” in return for further deregulation and permission to switch off rural service in favor of wireless alternatives. That’s great for AT&T, but a potential life-threatening disaster for rural America.

We continue to abide by our mandate: fighting data caps and consumption billing and promoting better broadband, regardless of what company or community supplies it.

As always, thank you so much for your financial support (the donate button that sustains us entirely is to your right) and for your engagement in the fight against unfair broadband pricing and policies. Broadband is not just a nice thing to have. It is an essential utility just as important as clean water, electricity, natural gas, and telephone service.

Phillip M. Dampier
Founder & President, Stop the Cap!

DSL and the ISPs That Love It: There’s Better Broadband in the Back-End of Crete

Frontier is the dominant phone company in West Virginia.

Frontier is the dominant phone company in West Virginia.

Ann Sheridan and Michael Sheridan are probably not related, but they share one thing in common: lousy DSL broadband.

Michael Sheridan, who lives in Lewisburg, W.V., is the lead plaintiff in a dragged-out class action lawsuit against Frontier Communications in the state, alleging the phone company has engaged in marketing flim-flam promising lightning fast DSL Internet speeds many customers complain they just do not receive. Ann Sheridan is a university lecturer in Ireland who doesn’t enjoy her DSL service as much as she endures it, when it works.

They live thousands of miles apart, but the problems are largely the same: for-profit phone companies trying to get as much revenue out of copper-based networks suitable for 20th century landlines while spending as little possible on broadband-friendly upgrades.

The phone company that dominates West Virginia has done all it can to have the lawsuit thrown out of court, claiming its terms and conditions mandate dissatisfied customers seek arbitration instead of a class action case. Frontier claims it inserted that condition into its terms and conditions a few years ago. Sheridan and his attorneys are now before the West Virginia Supreme Court of Appeals defending the case.

Crete is an island and part of the territory of Greece.

Crete is an island and part of the territory of Greece.

Despite Frontier’s insistence it sells contract-free Internet with no tricks or traps, Sheridan argues Frontier traps customers with unilateral fine print.

“Cases from all over the country establish that a simple notation on a website cannot form an agreement to arbitrate, a line item at the tail end of a bill that does not even state the specifics of the agreement cannot form an agreement to arbitrate, and a bill stuffer purporting to unilaterally amend an existing contractual relationship does not form an agreement to arbitrate,” the respondent’s brief states.

Many West Virginians with Frontier DSL complain they never exceed 5Mbps in speed, even though they are buying plans that advertise double that.

“Frontier’s practice of overcharging and simultaneously failing to provide the high-speed, broadband level of service it advertises has created high profits for Frontier but left West Virginia Internet users in the digital dark age,” according to the brief.

County Kildare, Ireland

County Kildare, Ireland

Life isn’t much better for those driving 30 minutes outside of Dublin, where broadband can be charitably described as “rustic.” In fact, Sheridan claims there is better broadband in the back-end of Crete than what the average resident in suburban and rural Ireland can manage to get out of questionable copper wiring.

In one notorious incident Sheridan described as “stereotypically Irish,” broadband service was brought to its knees for a good part of County Kildare for over a week earlier this year after a group of retaliatory cows upset over the Irish winter worked their way through a broken fence and collectively took out their frustration on a transformer they knocked over, taking out Internet access in the process.

Just having broadband service available doesn’t solve the digital divide if that service becomes oversold and unreliable. Both Sheridans argue broadband connections often deteriorate as more customers sign up. Without corresponding capacity upgrades to keep up with sales, speeds slow and service can become troublesome.

Broadband nemesis

Broadband nemesis

Patrick Donnelly, a farmer and builder from Calverstown reports Internet speeds 20 years ago were faster than what he gets today from his DSL service.

“Currently, I think I’m on my fourth provider. There’s all these little start-ups and generally they’re not too bad when you sign up originally,” Donnelly reports from his farm in Ireland. ‘But as soon as an ISP signs up more customers, speeds seem to get slower and slower. During peak usage times, it can become unusable.’

In West Virginia, some customers believe if their Internet speeds are poor, they need to buy an upgraded, faster speed tier from Frontier to compensate. That is usually a waste of money if the existing network is either inadequate or overburdened with customer traffic. But many customers don’t realize this. Often, fine print in a company’s terms and conditions disclaims the very bold and prominent speed claims that most customers actually see. Sheridan argues Frontier’s fine print goes even further by limiting their customers’ recourse when advertising claims do not meet reality.

“Frontier’s position is that consumers are obliged to be on alert at all times – diligently reviewing the fine print on each and every page of promotional material received – for the possibility that they may be waiving their rights by doing nothing at all,” the brief states.

Sheridan admits her point she’d move to Crete to get better broadband would be funny if the implications were not so serious.

“Not having broadband is a bit like not having electricity or only having it intermittently,” Sheridan said.

“It’s not a luxury any more, this is a necessity,” Donnelly said in agreement. “We’re 20 years behind now it’s time we caught up.”

Search This Site:

Contributions:

Recent Comments:

Your Account:

Stop the Cap!